Tender

Location Type Funding Description NIT NO. Corrigendum No. Date-of-Submission Date-of-Opening
Field Office Dept. SSTN .... Replacing/ repairing of Auxiliary switch, Rotary switch of 220kV Bus Isolators to get the exact status of 220kV Bus Isolators and for the proper functioning of semaphores of 220kV C&R Panels at 220 KV S/Stn Nuna Majra Bahadurgarh . NIT-29-XEN-TS-RTK Dated 27.11.2020



Dec 4, 2020 Dec 4, 2020
Field Office Dept. SSTN .... Repairing and replacing of defective relays and faulty modules, L&E switch, Isolator at 220 KV S/Stn Sampla. NIT-30-XEN-TS-RTK Dated 27.11.2020



Dec 7, 2020 Dec 7, 2020
Field Office Electrical Work .... For arresting of T/F oil leakage of 100 MVA,220/66 Kv Power T/F T-1 at 220 kv s/stn Shahabad (M) NIT-19-Oil Leakage of T/F-2020-21 Dated 27.11.2020



Dec 15, 2020
Field Office Civil Works .... Providing new fencing work in place of defective & old portion of fencing work in the existing switchyard at 66 KV S/Stn HVPNL, Ladwa. NIT-44-XEN-TS-YNR-2020-21 Dated 27.11.2020



Dec 4, 2020 Dec 7, 2020
Field Office Outsource Services .... Providing Sanitation Services, Arboriculture Services, office assistance & Security Services at 220 kv S/Stn. Bakana. (For the period 01.12.2020 to 31.03.2021). NIT-43-XEN-TS-YNR-2020-21 Dated 26.11.2020



Dec 2, 2020 Dec 3, 2020
Field Office Outsource Services .... Providing Sanitation Services, Arboriculture Services, office assistance & Security Services at 220 kv S/Stn. Bakana. (For the period 01.12.2020 to 31.03.2021). NIT-40-XEN-TS-YNR-2020-21 Dated 20.11.2020



Nov 26, 2020 Nov 27, 2020
Field Office Civil Works Capital Installation of Lights and Goal posts in the Hockey Ground of Power Colony HVPNL Panchkula NIT-14-GNL-161 Dated 11.11.2020



Dec 10, 2020
Field Office Civil Works Revenue Replacement of Wooden Door & Window shutters at HVPNL, Power Colony Panchkula NIT-15-CCD-286-Vol.-XII Dated 11.11.2020



Oct 12, 2020
Field Office Civil Works .... Surface dressing and gravelling in 132Kv and 33 Kv sub/Stn. Bhattu Kalan. NIT-25-CWD-2-Vol-XI-HVPNL-2020-21 Dated 15.10.2020



Dec 7, 2020 Dec 8, 2020
Field Office Civil Works .... Repair, maintenance & white Washing at NRB 220kV Sub Shahabad (M) NIT-18-AMB-Civil Works-2020-21 Dated 26.11.2020



Dec 10, 2020 Dec 11, 2020
Field Office Civil Works .... Repairing of boundary wall of yard at 220 kV S/Stn. Rampur Kamboyan & Repairing of damaged/broken chainlink fencing at 66 kV S/Stn. HVPNL, Chhachhrauli NIT-42-XEN-TS-YNR-2020-21 Dated 26.11.2020



Dec 3, 2020 Dec 4, 2020
Head Quarter Equipment .... 220kV Duplex, Directional Feeder C&R Panel NIT-1147 Dated 03.09.2020



Dec 14, 2020
Head Quarter Transmission line work Domestic Conversion of part section of 66kV Delhi – Gurugram line passing through Punjabi Bagh Nursery on the request of South Delhi Municipal Corporation (SDMC), New Delhi. NIT-11-PD & C Dated 16.10.2020



Dec 9, 2020 Dec 11, 2020
Field Office Department Work .... Augmentation of 66 KV S/Stn Sector-64 from 2x25/31.5MVA 66/11 KV T/F to 3X25/31.5 66/11 KV T/F NIT-09-TS-FBD-2020-21 Dated 07.10.2020



Dec 1, 2020 Dec 2, 2020
Head Quarter Equipment .... Procurement of 66KV CTs (Current Transformers) NIT-1144 Dated 01.09.2020



Dec 9, 2020
Field Office Civil Works .... Repairing and Mtc. Existing S/Stn. roads at 132 KV S/Stn. HVPNL, Jhajjar NIT-13-CWR-2020-21 Dated 24.11.2020



Dec 3, 2020
Field Office Civil Works .... Repairing of road and trench covers at 132 KV S/Stn. HVPNL, Mundlana NIT-12-CWR-2020-21 Dated 23.11.2020



Dec 1, 2020
Field Office Civil Works PFC Construction of 1 No 33 KV Capacitor bank and allied foundation at 132 kV Sub-station Dhigawa Jattan NIT-33-CWD-2-Vol-XI-HVPNL-2020-21 Dated 23.11.2020



Dec 3, 2020 Dec 4, 2020
Field Office O&M .... Scrapping and Painting of bay equipments and earth flats along with demarcation of colour codes in the switchyard at 66 kV S/stn. Yamuna Nagar including labour & material. NIT-41-XEN-TS-YNR-2020-21 Dated 23.11.2020



Dec 2, 2020 Dec 3, 2020
Field Office Civil Works PFC Construction of 1 No 33 KV Capacitor bank and allied foundation at 132 kV Sub-station Dadri-II NIT-32-CWD-2-Vol-XI-HVPNL-2020-21 Dated 23.11.2020



Dec 3, 2020 Dec 4, 2020
Field Office Civil Works .... Repairing of floor of control room building, raising height of T/F concrete and brick work around control room building at 66 KV S/Stn HVPNL, Chandpur. NIT-37-XEN-TS-YNR-2020-21 Dated 23.10.2020



Nov 27, 2020
Field Office Dept. SSTN .... Repair and Maintenance of Non Residential Building at 132kV sub station HVPNL, Kalanaur. NIT-28-XEN-TS-RTK Dated 20.11.2020



Dec 4, 2020
Field Office Dept. SSTN .... Repairing and mtc. of existing S/Stn. Edge angle and trench covers at 132 KV S/Stn. HVPNL, Matanhail. NIT-11-CWR-2020-21 Dated 20.11.2020



Dec 1, 2020
Field Office Civil Works .... Construction of 1 No. 20/25 MVA 132/33 kV T/F at bay No. B-2, double bus bar arrangement & 3 Nos 33 bays at 132 ....... NIT-30-CWD-2-Vol-XI-HVPNL-2020-21 Dated 28.10.2020



Dec 1, 2020 Dec 2, 2020
Field Office Dept. SSTN .... 2. Augmentation of 20/25 MVA, 132/33 KV T/F by 40/50 MVA, 132/33 KV T/f at 132 KV Sub-Station Mudlana NIT-27-XEN-TS-RTK Dated 19.11.2020



Dec 2, 2020
Head Quarter Transmission line work Domestic Construction of 132kV & 66kV transmission lines in Hisar, Sirsa & Faridabad area. NIT-12-PD & C Dated 18.11.2020



Jan 4, 2021 Jan 6, 2021
Field Office Civil Works .... Augmentation at 132 KV S/Stn. Indri from 1x20/25 MVA 132/33 KV + (1X10/16 MVA + 2X16/20 MVA) 132/11 KV Transformers to 2x20/25 MVA 132/33 KV + (1X10/16 MVA + 2X16/20 MVA) 132/11 KV T/F (Civil works). NIT-25-CWK-11-2020-21 Dated 18.11.2020



Nov 26, 2020 Nov 27, 2020
Field Office Capital Work .... Dismantling and Casting of foundation of 6 no. 220KV breaker of make ABB at 220KV S/Stn. Jorian. NIT-39-XEN-TS-YNR-2020-21 Dated 18.11.2020



Nov 25, 2020 Nov 26, 2020
Field Office Deposit Work .... Replacement /raising the height of towers crossing arrangement of 132 kV S/C Giri-Majri-Abdullapur transmission line tower location no. 169 & 170 near village Bhatli- Deposit work of PWD B&R. NIT-30-XEN-TS-YNR-2020-21 Dated 21.09.2020



Sep 30, 2020 Oct 1, 2020
Field Office Dept. SSTN .... Civil work at 220 kV S/Stn., HVPNL, Nuna Majra, 132 kV S/Stn., HVPNL, Sector-3, Rohtak and 132 kV S/Stn., HVPNL, IMT, Rohtak NIT-25-XEN-TS-RTK Dated 28.10.2020



Nov 25, 2020 Nov 25, 2020
Field Office Dept. SSTN .... Repairing and replacing of defective relays and faulty modules, L&E switch, Isolator at 220 KV S/Stn Sampla. NIT-26-XEN-TS-RTK Dated 17.11.2020



Nov 26, 2020
Field Office Civil Works .... PCC levelling, dressing, supply and spreading crushed bajri in yard at 132Kv S/Stn. Khaiekan NIT-24-CWD-2-Vol-XI-HVPNL-2020-21 Dated 15.10.2020



Nov 26, 2020 Nov 27, 2020
Field Office Civil Works Equity Construction of additional ODSG foundation for 132/11 kV Hot T/F at 132 kV Sub-Station Halluwas NIT-31-CWD-2-Vol-XI-HVPNL-2020-21 Dated 06.11.2020



Nov 26, 2020 Nov 27, 2020
Field Office Dept. SSTN .... Repairing of Existing road and trench covers at 132 KV S/Stn. HVPNL, Kalanaur NIT-10-CWR-2020-21 Dated 17.11.2020



Nov 24, 2020
Field Office Department Work Revenue Repair & Maintenance of 220kV Sirsa – PGCIL Matana (Fatehabad) line. NIT-01-XEN-TS-SRS-2020-21 Dated 07.08.2020



Dec 1, 2020
Head Quarter TurnKey SSTN .... Creation of 66KV S/Stn. Sector-16 Part, HSVP, Jagadhari with 1x25/31.5MVA + 2x12.5/16MVA, 66/11kV transformers with provision of two (2) No. 66Kv line bays for future.(Supply of 1x25/31.5MVA+2x12.5/16MVA, 66/11kV transformers shall be supplied byHVPN NIT-09-PD & C Dated 24.09.2020



Dec 1, 2020 Dec 4, 2020
Field Office Dept. SSTN .... Construction of boundary wall and U/C fencing at 220 KV S/Stn. HVPNL Rohtak. NIT-11-CWR 2019-20 Dated 13.01.2020



Feb 4, 2021 Feb 4, 2021
Field Office Dept. SSTN .... Repairing and mtc. of existing S/Stn. Edge angle and trench covers at 132 KV S/Stn. HVPNL, Bahu NIT-09-CWR-2020-21 Dated 16.11.2020



Nov 23, 2020
Field Office Capital Work Equity Scope of work against the work for Construction of 1 no. 33 kv line bay at 132 kv S/Stn. Chander Khurd to feed 33 kv S/Stn. Gullarwala NIT-27-2020-21-XENTS-HSR Dated 16.11.2020



Nov 25, 2020 Nov 26, 2020
Field Office Dept. SSTN .... Repairing of road and trench covers at 132 KV S/Stn. HVPNL, Sampla. NIT-08-CWR-2020-21 Dated 13.11.2020



Nov 23, 2020
Field Office Department Work .... Repair and Maintenance of residential colony at 220kV S/Stn. A-4 HVPNL, Faridabad NIT-10-TS-FBD-2020-21 Dated 29.10.2020



Nov 20, 2020 Nov 23, 2020
Head Quarter Purchase Material .... Procurement of 33KV CTs NIT-1152 Dated 16.11.2011



Dec 17, 2020
Head Quarter Equipment .... Procurement of Equipments for Oil Testing Labs NIT-1141 Dated 27.08.2020



Dec 15, 2020
Field Office Capital Work Equity 1. Painting of rusted 132/33/11KV towers, beams & supporting structures installed in switchyard of 132 KV S/Stn. Narnaund. 2. Replacement and renovation of old main Gate with New Gate at 132kV S/Stn. Narnaund. NIT-26-2020-21-XENTS-HSR Dated 12.11.2020



Nov 25, 2020 Nov 26, 2020
Field Office Dept. SSTN .... Replacement of 6 nos. old 220 kV Bus Isolators with new, replacement of old 9 nos. 66 Kv Bus Isolators with new and replacement of old 5 nos. 66Kv L&E switch with new at 220 kv S/Stn. Palwal. NIT-03-TS-PWL-2020-21 Dated 28.09.2020



Oct 28, 2020 Oct 28, 2020
Field Office Dept. SSTN .... Supply and Spreading of Gravel and PCC in B-8,B-9 at 132KV S/Stn Assaudha NIT-07-CWR-2020-21 Dated 10.11.2020



Dec 1, 2020
Head Quarter Equipment .... Procurement of 66 KV Lightening Arresters(Polymer Housing) NIT-1150 Dated 15.09.2020



Nov 24, 2020
Field Office Dept. SSTN .... Special Estimate for providing 220 kV bus protection scheme at 220 kV S/Stn HVPNL, Palwal. NIT-04-TS-PWL-2020-21 Dated 01.10.2020



Nov 23, 2020 Nov 23, 2020
Field Office Civil Works .... Arresting Oil Leakage of 220/132 KV, 100 MVA T-8 T/F at 220 KV S/Stn. HVPNL, Nissing NIT-34-XEN-TS-KNL-2020-21 Dated 04.11.2020



Nov 12, 2020
Field Office Department Work Revenue Painting of rusted steel structure at 220/132kV S/Stn. HVPNL, Sirsa NIT-03-XEN-TS-SRS-2020-21 Dated 23.10.2020



Nov 10, 2020
Field Office O&M .... Painting of rusted and un-galvanized tower of 66 kV S/C Basantpura line including labour & material. NIT-38-XEN-TS-YNR-2020-21 Dated 06.11.2020



Nov 17, 2020 Nov 18, 2020
Field Office Capital Work .... Augmentation of 66kV S/Stn. Gangori by providing additional 12.5/16MVA 66/11kV Transformer NIT-35-XEN-TS-YNR-2020-21 Dated 21.10.2020



Nov 12, 2020
Field Office O&M .... Scrapping and Painting of bay equipments and earth flats along with demarcation of colour codes in the switchyard at 66 kV S/stn. Yamuna Nagar including labour & material. NIT-36-XEN-TS-YNR-2020-21 Dated 22.10.2020



Nov 4, 2020 Nov 5, 2020
Field Office Civil Works .... Augmentation at 132 KV S/Stn. Indri from 1x20/25 MVA 132/33 KV + (1X10/16 MVA + 2X16/20 MVA) 132/11 KV Transformers to 2x20/25 MVA 132/33 KV + (1X10/16 MVA + 2X16/20 MVA) 132/11 KV T/F (Civil works). NIT-24-CWK-11-2020-21 Dated 04.11.2020



Nov 16, 2020 Nov 17, 2020
Head Quarter Equipment .... Procurement of 220 KV Lightening Arresters(Polymer Housing) NIT-1151 Dated 25.09.2020



Nov 16, 2020
Field Office Electrical Work .... Replacement of old/obsolete 11 KV VCB's panel board set of 132/11 KV, 10/16 MVA T-3 T/F at 132 KV S/Stn., HVPNL, Nilokheri NIT-32-XEN-TS-KNL-2020-21 Dated 29.10.2020



Nov 9, 2020
Field Office Electrical Work .... Replacement of old/obsolete 11 KV VCB's at 132 KV S/Stn., HVPNL, Karnal NIT-29-XEN-TS-KNL-2020-21 Dated 29.10.2020



Nov 6, 2020
Field Office Electrical Work .... Providing 33KV 1x5.436 MVAR Capacitor bank for 132/33 KV, 20/25 MVA T/F T-2 at 132 KV S/Stn. HVPNL, Sagga NIT-30-XEN-TS-KNL-2020-21 Dated 29.10.2020



Nov 6, 2020
Field Office Electrical Work .... Providing 33KV 2x5.436 MVAR Capacitor bank for 132/33 KV, 20/25 MVA T/F T-3 at 132 KV S/Stn. HVPNL, Gharaunda NIT-31-XEN-TS-KNL-2020-21 Dated 29.10.2020



Nov 9, 2020
Head Quarter Equipment .... 220kV Isolators and L&E NIT-1126 Dated 13.07.2020



Nov 16, 2020
Field Office Civil Works .... Supply and spreading of Gravel for 132kV bay B-10 to B-12 at 132kV Sub-Station Jhojhu Kalan NIT-29-CWD-2-Vol-X-HVPNL-2019-20 Dated 28.10.2020



Nov 9, 2020 Nov 10, 2020
Head Quarter Equipment .... 11kV 15 Panel Board VCBs 2000A NIT-1146 Dated 03.09.2020



Nov 10, 2020
Field Office Capital Work Equity The work of providing only metering arrangement for feeding 132kv TSS Satrod of RVNL by LILO of 132kv S/C BBMB Hisar - Hansi line ckt- I at 220 kv S/stn. BBMB Hisar, 132kv TSS Satrod and 132kv S/Stn.Hansi. NIT-25-2020-21-XENTS-HSR Dated 27.10.2020



Nov 5, 2020 Nov 6, 2020
Field Office Dept. SSTN .... Replacement of damaged floor tiles in the control room of 132KV Sub-station Sampla during the year 2020-21 NIT-24-XEN-TS-RTK Dated 26.10.2020



Nov 2, 2020 Nov 2, 2020
Field Office Dept. Line .... Disc Insulators cleaning of Transmission lines in T/L S/Div. Rohtak under T/S Division, HVPNL, Rohtak NIT-23-XEN-TS-RTK Dated 26.10.2020



Nov 2, 2020 Nov 2, 2020
Field Office Department Work Revenue Maintenance and repair/rectification of SCADA system at 220kV S/Stn. Chormar. NIT-02-XEN-TS-SRS-2020-21 Dated 23.10.2020



Nov 3, 2020
Field Office Dept. Line .... Strengthening of various Towers of 220/132KV Transmission Lines by providing work of Rusty Stubs repair,Anticorrosion paint and Muffing/Chimney Height Raising , Tack welding & Member Strengthening upto first storey. under T/S Division, HVPNL, Rohtak NIT-22-XEN-TS-RTK Dated 23.10.2020



Oct 30, 2020 Oct 30, 2020
Head Quarter Equipment .... Procurement of 33KV VCBs 630A NIT-1145 Dated 01.09.2020



Nov 6, 2020
Field Office Dept. Line .... Disc Insulators cleaning of Transmission lines in T/L S/Div. Bahadurgarh under T/S Division, HVPNL, Rohtak NIT-21-XEN-TS-RTK Dated 23.10.2020



Oct 30, 2020 Oct 30, 2020
Head Quarter Equipment .... PROCUREMENT OF MARSHALING KIOSK-300TB, STAINLESS STEEL NIT-1142 Dated 28.08.2020



Oct 20, 2020
Field Office Civil Works .... Construction of 03 Nos 220 KV SF-6 Breaker foundation at 220 kV Sub-Station IA Hisar. NIT-23-CWD-2-Vol-XI-HVPNL-2020-21 Dated 07.10.2020



Nov 3, 2020
Field Office TurnKey SSTN .... Creation of 220kV substation Nonand (Rohtak) with proposed capacity of [2x160 MVA, 220/132 kV]+ [1x100 +1x100(as Hot)] MVA, 220/33 kV Transformer with 33KV GIS bays+ 2x0.2MVA 33/0.4 kV transformers (for auxiliary supply) + 1x4MVA 33/11 kV transforme NIT-08-PD & C Dated 10.08.2020



Nov 3, 2020 Nov 6, 2020
Field Office Transmission line work .... For Aerial Inspection of transmission lines under TS Zone HVPNL, Panchkula and Hisar Expression of Interest Dated 16.10.2020



Nov 16, 2020
Field Office Civil Works .... Supply and spreading crushed bajri in yard at 132Kv S/Stn .Modho Singhana NIT-26-CWD-2-Vol-XI-HVPNL-2020-21 Dated 15.10.2020



Oct 26, 2020 Nov 5, 2020
Field Office Dept. SSTN .... Painting and phase marking of CTs and CVTs at 220 kV Nuna Majra. 2. Providing bay board at 5 Nos. S/Stn. 3. Alignment of 220 kV and 132 kV Bus, line and T/F isolators at 220 kV Nuna Majra. 4. Replacement of old T-Clamps/PG Clamps with C-wedge connect NIT-17-XEN-TS-RTK Dated 08.10.2020



Oct 20, 2020 Oct 20, 2020
Head Quarter Transmission line work Deposit Work Construction of 132 kV lines in Rewari, Mahendergargh & Sirsa NIT-10-PD & C Dated 12.10.2020



Nov 25, 2020 Nov 27, 2020
Head Quarter Purchase Material .... Procurement of relays NIT-1133 Dated 29.07.2020



Oct 28, 2020
Field Office Electrical Work Departmental Creation of double bus bar arrangement along with the 3no. 66kv line bay and bus coupler arrangement at 66kv D/C Rajokheri- Malikpur line at 66kv s/stn Adhoya.Laying of 66 kv XLPE power Cable along with accessories NIT-14-Laying XLPE Power Cable-2020-21 Dated 10.09.2020



Oct 21, 2020 Oct 21, 2020
Field Office Dept. SSTN .... Replacement of factory manufactured wire gauge of windows & shutters and replacement of electrical wiring & fittings in various quarters in residential colony at 66kv S/Stn Palwal (including supply, dismantlement & fixing). NIT-02-TS-PWL-2020-21 Dated 26.09.2020



Oct 29, 2020 Oct 29, 2020
Field Office Civil Works .... Estimate for Providing 100MVA 220/132 KV T/F Plinth (Hot) along with allied equipments at 220KV S/Stn. Karnal. ) NIT-23-CWK-11-2020-21 Dated 09.10.2020



Oct 22, 2020 Oct 23, 2020
Field Office Civil Works .... Dismantlem ent of residential and non residential building (Old building of the then 33KV ) at 132KV S/Stn. Bhore (Civil Works) NIT-17-CWK-11-2020-21 Dated 06.08.2020 (Retender)



Oct 22, 2020 Oct 23, 2020
Field Office Dept. SSTN .... Supply of 03 nos. Bolero Camper (Make Mahindra /Tata/ Ford/Toyota/Honda/Maruti etc) on contract basis under XEN TS Divn. HVPNL Rohtak NIT-15-XEN-TS-RTK Dated 28.09.2020



Oct 15, 2020 Oct 15, 2020
Head Quarter Equipment .... PROCUREMENT OF 20/25MVA 66/33KV POWER TRANSFORMER. NIT-1132 Dated 17.07.2020



Oct 26, 2020
Field Office Civil Works .... Mtc. of approach road and Mtc. of main gate at 220 kV S/Stn. Jorian, Repairing of boundary wall of yard at 220 kV S/Stn. Rampur Kamboyan & Repairing of damaged/broken chainlink fencing at 66 kV S/Stn. HVPNL, Chhachhrauli NIT-31-XEN-TS-YNR-2020-21 Dated 21.09.2020



Oct 14, 2020
Head Quarter Equipment .... Procurement of ACSR Panther Conductor NIT-1143 Dated 28.08.2020



Oct 20, 2020
Field Office Dept. SSTN .... Creation of one no. 66kV line bay at 220kV substation Meerpur Kurali to accommodate 2nd circuit of 66kV Meerpur Kurali - Hodal D/C line. NIT-06-TS-PWL-2020-21 Dated 01.10.2020



Oct 26, 2020 Oct 26, 2020
Field Office Dept. SSTN .... Providing additional 12.5/16 MVA, 66/11 kV T/F, T-4 at 220 kV S/Stn Meerpur Kurali. NIT-05-TS-PWL-2020-21 Dated 01.10.2020



Oct 26, 2020 Oct 26, 2020
Field Office Civil Works .... Supply and spreading of 25mm to 40mm gravel in switch yard at 132 kV Sub-Station HVPNL, Bibipur NIT-18-CWD-2-Vol-XI-HVPNL-2020-21 Dated 30.09.2020



Oct 12, 2020 Oct 13, 2020
Field Office Dept. SSTN .... Augmentation of 20/25 MVA, 132/33 KV transformer to 40/50 MVA, 132/33 KV transformer at 132 KV Sub-station Sampla.(Online Tender id No. 2020_HBC_146483_1) NIT-16-XEN-TS-RTK Dated 30.09.2020



Oct 5, 2020 Oct 5, 2020
Head Quarter Equipment .... Procurement of various sizes of Bolted Type Substation Hardware Fittings Clamps & Spacers NIT-1138 Dated 25.08.2020



Oct 14, 2020
Field Office Dept. SSTN .... Providing metering arrangements of 132 KV Chandi-Khrainti line bay at 132 KV Sub-Station Chandi NIT-14-XEN-TS-RTK Dated 24.09.2020



Oct 5, 2020 Oct 5, 2020
Field Office Dept. SSTN .... 2. Augmentation of 20/25 MVA, 132/33 KV transformer to 40/50 MVA, 132/33 KV transformer at 132 KV Sub-station Mudlana NIT-13-XEN-TS-RTK Dated 24.09.2020



Oct 5, 2020 Oct 5, 2020
Field Office Capital Work .... Revamping and making of 66kV S/Stn. HVPNL, Yamuna Nagar as Model Sub station. NIT-33-XEN-TS-YNR-2020-21 Dated 24.09.2020



Oct 8, 2020 Oct 9, 2020
Field Office Equipment .... procurement of 33KV VCBs (2000A) against e-Tender Enquiry No. QDP-1230 NIT-1113 Dated 22.06.2020



Oct 9, 2020
Field Office Civil Works Civil Mtc. 74.2 Providing new fencing work in place of defective & old portion of fencing work in the existing switchyard at 66 KV S/Stn HVPNL, Ladwa. NIT-32-XEN-TS-YNR-2020-21 Dated 22.09.2020



Oct 6, 2020 Oct 7, 2020
Field Office Dept. SSTN .... Augmentation of 132 kv S/Stn. Jassia from 1x 20/25 MVA, 132/33 kv + 1 x 16/20 MVA, 132/11 kv T/F’s to 2 x 20/25 MVA, 132/33 kv + 1 x 16/20 MVA, 132/11 kv T/F’s, Subject to dismantlement of abandoned colony NIT-06-CWR-2020-21 Dated 22.09.2020



Oct 8, 2020 Oct 8, 2020
Head Quarter Equipment .... Procurement of GS Earth Wire 7/2.5 mm NIT-1131 Dated 15.07.2020



Oct 5, 2020
Head Quarter Equipment NABARD 160MVA, 220/66kV Power Transformer NIT-1116 Dated 29.06.2020



Oct 7, 2020
Field Office Civil Works .... Construction of 1 No.220/132 100 MVA.................. NIT-14-CWD-2-Vol-XI-HVPNL-2020-21 Dated 03.09.2020



Sep 24, 2020 Sep 25, 2020
Field Office Civil Works Revenue Maintenance of residential quarters in power colony at 132kV S/stn Panipat NIT-17-TS-PNP-2020-21 Dated 16.09.2020



Sep 26, 2020 Sep 26, 2020
Field Office Department Work .... Replacement of existing 220KV Pneumatic Drive type breaker of 100MVA T/F T2 at 220 KV A-3, Palla (Faridabad). NIT-08-TS-FBD-2020-21 Dated 10.08.2020



Sep 22, 2020 Sep 23, 2020
Field Office Civil Works .... for construction of 1 no. 20/25 MVA T/F plinth with bus coupler bay and 1 no. 33 KV bay for Thehnewal with allied equipment at 220 KV S/Stn. Cheeka. (Civil Works) NIT-22-CWK-11-2020-21 Dated 14.09.2020



Sep 30, 2020 Sep 29, 2020
Field Office Civil Works Departmental Creation of double bus bar arrangement along with the 3no. 66kv line bay and bus coupler arrangement at 66kv D/C Rajokheri- Malikpur line at 66kv s/stn Adhoya.Laying of 66 kv XLPE power Cable along with accessories NIT-15-Str.Painting-AMB-2020-21 Dated 11.09.2020



Oct 1, 2020 Oct 2, 2020
Field Office Electrical Work .... Replacement bend and twisted Tower Location No. 63 (DA+3) TATA design of LILO of one CKT of 220 KV D/C Bastara-Kaul line at 800 KV HVDC Bhadson. NIT-28-XEN-TS-KNL-2020-21 Dated 11.09.2020



Sep 18, 2020
Head Quarter Equipment .... Procurement of 11kV Combined CT/PT, CT Ratio 1200-900/1-1 A NIT-1123 Dated 02.07.2020



Sep 28, 2020
Field Office Capital Work Equity 1. Painting of rusted 132/33/11KV towers, beams & supporting structures installed in switchyard of 132 KV S/Stn. Narnaund. 2. Replacement and renovation of old main Gate with New Gate at 132kV S/Stn. Narnaund NIT-24-2020-21-XENTS-HSR Dated 10.09.2020



Sep 28, 2020 Sep 29, 2020
Head Quarter Equipment .... Procurement of 11kV NCTs and 66kV NCTs NIT-1129 Dated 15.07.2020



Sep 25, 2020
Field Office Electrical Work .... Creation of one no. 33 KV line bay at 132 KV S/Stn HVPNL Bhiwani (old) to accommodate the feeding of 33 KV S/Stn. BTM Road Bhiwani (Tender ID:-2020_HBC_138614_2) NIT-06-TS-BHW-2020-21 Dated 14.08.2020 (Re-Tender)



Sep 14, 2020 Sep 15, 2020
Field Office Dept. SSTN .... The Walk way, Preliminary and Detailed survey for various lines i.e. 220/132 KV under XEN TS Division HVPNL Rohtak NIT-11-XEN-TS-RTK Dated 01.09.2020



Sep 14, 2020 Sep 14, 2020
Field Office Electrical Work .... Augmentation of 16/20 MVA 132/33 KV T/F T-3 with 40/50 MVA, 132/33 KV Power T/F at 132 KV S/Stn. HVPNL, Miran Tender ID:- 2020_HBC_139029_2). NIT-10-TS-BHW-2020-21 Dated 20.08.2020 (Re-tender)



Sep 14, 2020 Sep 15, 2020
Field Office Civil Works .... Extension of S/H Bldg. IDCT, Const. of 01 No. T/F Plinth, Anti-Fire wall, ODSG foundations, ODCT for providing Addl. 25/31.5 MVA 66/11KV T/F at 66KV S/Stn. Bhorakalan (Gurugram) NIT-02-CWG-11-2020-21 Dated 19.08.2020



Sep 28, 2020 Oct 1, 2020
Field Office Electrical Work .... Creation of one no. 33 KV line bay at 132 KV S/Stn HVPNL Badhra to accommodate the feeding of 33 KV S/Stn. Bisalwas during the year 2020-21 (Tender ID:-2020_HBC_138620_2) NIT-08-TS-BHW-2020-21 Dated 14.08.2020 (Re-Tender)



Sep 14, 2020 Sep 15, 2020
Field Office Electrical Work .... Creation of one no. 33 KV line bay at 220 KV S/Stn HVPNL Sagwan to accommodate the feeding of 33 KV S/Stn. Bapora-II during the year 2020-21 Tender ID:- 2020_HBC_138617_1). NIT-07-TS-BHW-2020-21 Dated 14.08.2020 (Re-Tender)



Sep 14, 2020 Sep 15, 2020
Field Office Electrical Work .... Augmentation of 20/25 MVA 132/33 KV T/F T-1 with 40/50 MVA, 132/33 KV Power T/F at 132 KV S/Stn. HVPNL, Berla Tender ID:- 2020_HBC_139020_2). NIT-09-TS-BHW-2020-21 Dated 20.08.2020 (Re-Tender)



Sep 14, 2020 Sep 15, 2020
Head Quarter Equipment .... Procurement of 33KV Lightening Arresters(Polymer Housing) NIT-1148 Dated 07.09.2020



Oct 9, 2020
Head Quarter Equipment .... 220/33KV, 100MVA Power Transformer NIT-1149 Dated 07.09.2020



Oct 12, 2020
Field Office Capital Work .... Dismantling and Casting of foundation of 1 no. 220KV breaker of CGL at 220KV S/Stn. Jorian. NIT-29-XEN-TS-YNR-2020-21 Dated 03.09.2020



Sep 14, 2020 Sep 15, 2020
Field Office Civil Works .... Providing flood retaining wall around the huge soil mass supporting T. No. 70 of 66kV D/C Hydle-Yamuna Nagar line and toe wall at 66 kV S/Stn., HVPNL, Jathlana. NIT-26-XEN-TS-YNR-2020-21 Dated 24.08.2020



Sep 10, 2020
Field Office Electrical Work .... Augmentation of existing 20/25 MVA to 40/50 MVA 132/33 KV T-2 T/F and providing additional 33 KV Bay (D-6) for Gangar at 132 KV S/Stn., HVPNL, Ramba. NIT-27-XEN-TS-KNL-2020-21 Dated 02.09.2020



Sep 9, 2020
Field Office Civil Mtc. Revenue Repair & Civil maintenance works in 29 Nos. Residential quarters in HVPNL Colony at 132 KV S/Stn HVPNL, Bhiwani during the year-2020-21 on Through Rate Tender ID:- 2020_HBC_142215_1). NIT-12-TS-BHW-2020-21 Dated 01.09.2020



Sep 7, 2020 Sep 8, 2020
Field Office Civil Mtc. Revenue Repair & Civil maintenance works in Non-Residential building at 132 KV S/Stn HVPNL, Bhiwani old during the year-2020-21 on Through Rate Tender ID:- 2020_HBC_142204_1). NIT-11-TS-BHW-2020-21 Dated 01.09.2020



Sep 7, 2020 Sep 8, 2020
Head Quarter Equipment .... Procurement of 11kV Single Core XLPE Aluminum Power cable (630sq mm) NIT-1130 Dated 15.07.2020



Sep 16, 2020
Field Office Civil Works .... Const. of 33 KV Capacitor bank and ODSG foundation at 220 KV S/Stn. Nuna Majra (B.Garh) (civil works only) NIT-05-CWR-2020-21 Dated 01.09.2020



Sep 17, 2020 Sep 17, 2020
Field Office O&M .... Scrapping and painting of structure at 66 kV S/Stn. HVPNL, Yamuna Nagar including labour & material NIT-28-XEN-TS-YNR-2020-21 Dated 28.08.2020



Sep 8, 2020 Sep 9, 2020
Field Office Civil Works Departmental providing submersible tubewell with 400 Feet bore against failed bore at 66 KV S/Stn HVPNL Mohra NIT-10-AMB-Submersible Bore-2020-21 Dated 13.08.2020



Sep 10, 2020
Field Office Civil Works .... Construction of Addl. ODSG foundation and ODCT for 66KV line bay from 220KV Sub-Station Sector-1 IMT Manesar to 66KV Sub-Station Old Manesar at 66KV Sub-Station Old Manesar NIT-06-CWG-11-2020-21 Dated 27.08.2020



Sep 17, 2020 Sep 22, 2020
Field Office Civil Works .... Construction of Additional ODSG & ODCT foundation of 66KV line bay from 220KV Sub-Station, Sector-1, IMT Manesar to 66KV Sub-Station, Old Manesar at 220KV Sub-Station, Sector-1, IMT Manesar NIT-04-CWG-11-2020-21 Dated 26.08.2020



Sep 16, 2020 Sep 21, 2020
Field Office Civil Works .... Construction of ODSG foundation at Bay No. D-5 for Panchgaon to Rozka-Meo line at 220KV Sub-Station, Panchgaon NIT-05-CWG-11-2020-21 Dated 27.08.2020



Sep 17, 2020 Sep 22, 2020
Field Office O&M .... Cleaning of moisture and providing insulation coating on 11KV Bus Bar of 11KV VCBs of 25/31.5MVA 66/11KV T/F T-2 at 66kV S/Stn. HVPNL, Jathlana. NIT-27-XEN-TS-YNR-2020-21 Dated 27.08.2020



Sep 7, 2020 Sep 8, 2020
Field Office Civil Works .... Creation of 01 no. 132 KV bay at 132 KV S/Stn. Mundlana to accommodate feeding of 132 KV TSS Mundlana by HVPN as a Deposit work of Railways.(R8) (civil works) NIT-04-CWR-2020-21 Dated 27.08.2020



Sep 17, 2020 Sep 17, 2020
Head Quarter Equipment .... Procurement of 33kV PTs, 66kV PTs & 132kV Metering PTs NIT-1125 Dated 06.07.2020



Sep 11, 2020
Field Office Dept. SSTN .... Creation of 132 KV Line bay at 132 KV Sub-Station Assaudha to accommodate the 132 KV S/C line from 220 KV substation Sampla and Creation of one no 132 KV bay at 132 KV substation Mundlana to accommodate feeding of 132 KV TSS Mundlana NIT-10-XEN-TS-RTK Dated 26.08.2020



Sep 4, 2020 Sep 4, 2020
Head Quarter Equipment .... Procurement of 220 KV Line Current Transformer NIT-1119 Dated 29.06.2020



Sep 9, 2020
Head Quarter Equipment .... PROCUREMENT OF 33kV ISOLATORS. NIT-1136 Dated 13.08.2020



Sep 18, 2020
Head Quarter Equipment .... E-PROCUREMENT OF 66kV ISOLATORS. NIT-1137 Dated 14.08.2020



Sep 21, 2020
Field Office Outsource Services Departmental Residential Buildings and Rest houses in Power House Colony. Providing Sanitation Services, Arboriculture Services & Security Services in Power House Colony at Dhulkote complex Ambala. NIT-13-Dkt-Colony-Amb-2020-21 Dated 28.08.2020



Sep 7, 2020
Field Office Civil Works .... Provision of architectonic structure car parking shed in front at Shakti Bhawan, HVPNL, Panchkula NIT-12-CCD-383 Dated 25.08.2020



Sep 3, 2020
Field Office Civil Works .... Augmentation from 16/20MVA to 40/50MVA 132/33KV T/F with 1 no 132 KV bus coupler bay along with allied equipment at 132 KV S/Stn. Siwan (Surface dressing Supply & spreading of gravel) (Civil Works). NIT-20-CWK-11-2020-21 Dated 24.08.2020



Sep 7, 2020 Sep 8, 2020
Field Office Civil Works .... Repair & Mtc. of Road/Path for Residential Colony at 66KV SubStation, Mehrauli Road, Gurugram NIT-01-CWG-11-2020-21 Dated 29.07.2020



Sep 7, 2020 Sep 11, 2020
Head Quarter Equipment .... 132kV CVTs NIT-1128 Dated 14.07.2020



Sep 3, 2020
Field Office Civil Works .... Providing 1 no. 100MVA 220/33KV T/F(Hot) plinth along with ODSG foundations and allied equipments at 220KV S/Stn. Bastara (Civil Works) NIT-19-CWK-11-2020-21 Dated 10.08.2020



Sep 7, 2020 Sep 8, 2020
Field Office Electrical Work Departmental creation of 2 No. 66KV line bays along with bus coupler bay to accommodate 66KV D/C Rajokheri –Kesri Line at 66 KV S/Station Kesri. NIT-11-Creation of 2 No. 66KV Line Bays 2020-21 Dated 19.08.2020



Sep 1, 2020 Sep 2, 2020
Field Office Electrical Work Departmental providing double bus arrangement alongwithbus coupler bay at 66 KV S/Station Industrial Area NIT-12-Double Bus Arrangement 2020-21 Dated 19.08.2020



Sep 3, 2020 Sep 4, 2020
Head Quarter Equipment .... Various rating lines and earth switches. NIT-1127 Dated 13.07.2020



Sep 4, 2020
Field Office Deposit Work .... Replacement /raising the height of towers crossing arrangement of 132 kV S/C Giri-Majri-Abdullapur transmission line tower location no. 169 & 170 near village Bhatli- Deposit work of PWD B&R. NIT-23-XEN-TS-YNR-2020-21 Dated 20.07.2020



Aug 18, 2020
Field Office Civil Works .... Mtc. of approach road and Mtc. of main gate at 220 kV S/Stn. Jorian, Repairing of boundary wall of yard at 220 kV S/Stn. Rampur Kamboyan & Repairing of damaged/broken chainlink fencing at 66 kV S/Stn. HVPNL, Chhachhrauli NIT-22-XEN-TS-YNR-2020-21 Dated 16.07.2020



Aug 13, 2020
Field Office Equipment .... Procurement of various sizes of composite polymer insulator strings. NIT-1135 Dated 11.08.2020



Sep 14, 2020
Field Office Electrical Work .... Replacement of old and obsolete of 132 KV SF-6 breaker of 132 KV bus coupler bay at 132 KV S/Stn. HVPNL, Munak NIT-25-XEN-TS-KNL-2020-21 Dated 13.08.2020



Aug 21, 2020
Field Office Civil Works .... Construction of Boundary wall Near Gate No. 1 & Mtc. of Kothi No. 7 at 220/132KV S/Stn. Power House Colony, Karnal NIT-26-XEN-TS-KNL-2020-21 Dated 13.08.2020



Aug 24, 2020
Head Quarter Equipment .... Procurement of 33kV Isolator (2000A) NIT-1122 Dated 01.07.2020



Aug 25, 2020
Field Office Civil Works .... Surface dressing and gravelling in 132kV and 33kV yard at 132 kV Sub-Station Bhattu Kalan NIT-13-CWD-2-Vol-XI-HVPNL-2020-21 Dated 22.07.2020



Aug 24, 2020 Aug 25, 2020
Field Office Service Works Admin Charges One no. Non AC Jeep/Bolero with driver (Make Mahindra &Mahindra) at 66 kV S/Stn Jansui under Xen TS Divn. HVPNL Ambala on contract basis under TS Divn. HVPNL Office Ambala. During the financial year 2020-21 or as per requirement. NIT-06-Bolero-2020-21 Dated 07.07.2020



Aug 20, 2020
Field Office Civil Works .... Creation of 1 No. new 33KV Bay at 132KV S/Stn.Ramba to facilitate the feeding of new 33KV S/Stn. Gangar . (Civil Works). NIT-18-CWK-11-2020-21 Dated 10.08.2020



Sep 1, 2020 Sep 2, 2020
Field Office Electrical Work .... Replacement of PCC poles, LT conductors with new cables of 200 KV T/F Near 220 KV S/Stn. at Power House Colony, HVPNL, Karnal NIT-24-XEN-TS-KNL-2020-21 Dated 07.08.2020



Aug 18, 2020
Field Office Dept. SSTN .... 2. Augmentation of 20/25 MVA, 132/33 KV T/F by 40/50 MVA, 132/33 KV T/f at 132 KV Sub-Station Mudlana and Providing 16/20 MVA, 132/11 KV Hot Power Transformer at 220 KV S/Stn, Nuna-majra (Bahadurgarh) NIT-07-TS-RTK Dated 05.08.2020



Aug 12, 2020
Field Office Civil Works .... Dismantlem ent of residential and non residential building (Old building of the then 33KV ) at 132KV S/Stn. Bhore (Civil Works) NIT-17-CWK-11-2020-21 Dated 06.08.2020



Aug 26, 2020 Aug 27, 2020
Field Office Civil Works .... Construction of Boundary wall at 220KV Sub-Station, Badshahpur (Gurugram) NIT-09-CWG--2019-20 Dated 16.01.2020



Aug 18, 2020 Aug 21, 2020
Field Office O&M .... Painting of rusted towers and structures of 66 kV S/C Jorian Gobindpuri line including labour & material. NIT-25-XEN-TS-YNR-2020-21 Dated 06.08.2020



Aug 17, 2020 Aug 18, 2020
Field Office O&M .... Repair of 28 no. Rusty Stubs of Tower legs for strengthening the tower at various location of 66 KV Khera- Gobindpuri Ckt-I S/C line. NIT-24-XEN-TS-YNR-2020-21 Dated 22.07.2020



Aug 11, 2020
Field Office Civil Works .... augmentation of 132KV S/Stn Kirmach from 20/25 MVA 132/33KV to 40/50 MVA , 132/33KV power T/F, creation of 1 No. 132KV bay at bay B-7 alongwith allid equipment and creation of 1 No. 33KV bay D-7 alongwith allid equipment at 132Kv S/Stn Kirmach. (Site NIT-16-CWK-11-2020-21 Dated 04.08.2020



Aug 20, 2020 Aug 21, 2020
Field Office Equipment .... PROCUREMENT OF 200 KVAR CAPACITOR CELL (7.3kV) NIT-1134 Dated 04.08.2020



Sep 4, 2020
Field Office Department Work .... Replacement of existing 220KV Pneumatic Drive type breaker of 100MVA T/F T2 at 220 KV A-3, Palla (Faridabad). NIT-07-TS-FBD-2020-21 Dated 07.07.2020



Aug 7, 2020 Aug 8, 2020
Field Office Civil Works .... Constructing Additional 1 No 10/16 MVA 132/33 KV T/F plinth at bay B-2 with 33 KV Bus (D-1 to D-4) with creation of one new outgoing bay for Bhutan-Kheri at 132 KV S/Stn. Bhadson(Civil Works). (Surface dressing,Supply&Spreading of crushed bajri) NIT-15-CWK-11-2020-21 Dated 30.07.2020



Aug 21, 2020 Aug 24, 2020
Field Office Civil Works Capital Outsourcing of skilled / unskilled manpower for general maintenance of residential and non–residential building, Arboriculture / horticulture including cleaning of roads and paths and security arrangement at 132 KV Power House Complex, Gohana Road, NIT-21-GNL-161 Dated 11.03.2020



Aug 10, 2020
Field Office Civil Works .... providing 132/11KV 16/20MVA (HOT) T/F in front of bays B-15 along with allied equipments at 220 KV S/Stn. Pehowa.(Civil Works) NIT-14-CWK-11-2020-21 Dated 30.07.2020



Aug 20, 2020 Aug 21, 2020
Field Office Civil Works .... Extension of Switch House Building, Indoor Cable Trenches at 66KV Sub-Station, Sec-43, Gurugram NIT-18-CWG-2019-2020 Dated 06.03.2020



Aug 20, 2020 Aug 25, 2020
Field Office Civil Works .... Creation of 1no new 33KV outgoing bay at 132KV S/Stn. Biana to accommodate NIT-13-CWK-11-2020-21 Dated 29.07.2020



Aug 17, 2020 Aug 18, 2020
Field Office Civil Works .... Creation of additional 1 no. 132 kv bay at 132 kV S/Stn.Malikpur. (Civil Works) NIT-12-CWK-11-2020-21 Dated 29.07.2020



Aug 17, 2020 Aug 18, 2020
Field Office Electrical Work .... Repairing of 16 Nos Stub at Tower Location No. 14, 34, 36 and 40 of 220 KV Karnal-PTPS Transmission line. NIT-23-XEN-TS-KNL-2020-21 Dated 28.07.2020



Aug 7, 2020
Field Office Civil Works .... Estimate for Construction of 33kv Cap.Bank foundation (1x5.436MVAR) along with allied equipment at 132 KV S/Stn. Rajound. (Civil Works).) NIT-11-CWK-11-2020-21 Dated 28.07.2020



Aug 13, 2020 Aug 14, 2020
Head Quarter Transmission line work Domestic Construction of 132 kV transmission lines in Kurukshetra and Panipat area. NIT-1103 Dated 13.02.2020



Aug 10, 2020
Field Office Transmission line work Domestic Stringing of 66kV transmission lines in Palwal area NIT-03-PD&C Dated 02.03.2020



Aug 10, 2020
Field Office Civil Works .... Deposit work for providing 2 No. 220KV line bay ( 220KV D/C Mund -IOCL PNP line) alongwith allied equipments at 220KV S/Stn Mund (Civil works) NIT-10-CWK-11-2020-21 Dated 27.07.2020



Aug 13, 2020 Aug 14, 2020
Field Office Electrical Work REC Providing 132 KV & 33 KV S/Stn. Type Structure and allied equipments of 132/11 KV, 10/16 MVA, T-1 and T-2 T/F at 132 KV S/Stn. HVPNL, Gharaunda NIT-22-XEN-TS-KNL-2020-21 Dated 23.07.2020



Aug 4, 2020
Field Office Electrical Work REC Replacement of old and obsolete of 132 KV SF-6 breaker of 10/16 MVA, 132/11 KV T/F T-2 at 132 KV S/Stn. HVPNL, Amin NIT-21-XEN-TS-KNL-2020-21 Dated 23.07.2020



Aug 4, 2020
Field Office Civil Works .... Supply and spreading of Gravel for 40/50 MVA 220/132 KV T/F, 33KV BAY D5............. NIT-09-CWD-2-Vol-XI-HVPNL-2020-21 Dated 11.06.2020



Aug 5, 2020 Aug 6, 2020
Field Office Civil Works .... Construction of 33KV capacitor bank bay at 132 kv Sub-Station Jiwan Nagar NIT-08-CWD-2-Vol-XI-HVPNL-2020-21 Dated 10.06.2020



Aug 5, 2020 Aug 6, 2020
Field Office Civil Works .... onstruction of 33 kV line bay at 132kV Sub-Station Kariwala for independent feeding of 33 kV Sub-Station kariwala NIT-12-CWD-2-Vol-XI-HVPNL-2020-21 Dated 21.07.2020



Aug 5, 2020 Aug 6, 2020
Head Quarter Outsource Services .... OUTSOURCING OF SKILLED/UNSKILLED MANPOWER NIT-14-2020-CETS-PKL Dated 16.07.2020



Aug 7, 2020 Aug 10, 2020
Field Office Electrical Work Departmental Boring up to water level including pipe charcoal& making of earth pit along with cover and fixing of earth mat& with all material and labour at 220 kv S/Stn. Tepla NIT-09-Earth Bore-2020-21 Dated 17.07.2020



Jul 25, 2020 Jul 27, 2020
Field Office Civil Works .... Providing 1 No. 20/25 MVA, 132/33 KV T/F at Bay B-8 and 33 KV side at D-3 with 33 KV Cap. Bank at D-1, 1 No. Bus sanctionalisor between D-2 and D-3, 3 No. 33 KV Bus PT near Bay D-4 along with allied equipment at 132 KV S/St. Ismilabad..(Site Surfacin NIT-09-CWK-11-2020-21 Dated 17.07.2020



Aug 4, 2020 Aug 5, 2020
Field Office Manpower .... OUTSOURCING OF SKILLED/UNSKILLED MANPOWER NIT-13-CE-TS-HSR-2020-21 Dated 16.07.2020



Aug 7, 2020 Aug 10, 2020
Field Office Transmission line work Deposit Work Conversion of part section of 66kV D/C Delhi-Gurugram line from overhead to underground from T.L. No. 112 to T.L. No. 116 in new alignment passing though M/s Atul Kataria School and Shree Mata Sheetla Mela ground Gurugram NIT-07-PD & C Dated 15.07.2020



Aug 28, 2020 Aug 31, 2020
Field Office TurnKey SSTN NABARD 66kV GIS Substation Phase-1, Udyog Vihar, Gurgaon with LILO of one circuit of 66kV Dundahera Ph-IV – Sec-23A D/C Line at proposed 66kV S/Stn Udyog Vihar Ph-I (GIS) HSIIDC Gurgaon through underground cable (8) core) of size 1200mm2 by HVPNL and ... NIT-06-PD & C Dated 15.07.2020



Aug 31, 2020 Sep 10, 2020
Field Office O&M .... Painting of un-galvanized towers of 66 kV D/C Jorian Ynr line including labour & material NIT-21-XEN-TS-YNR-2020-21 Dated 15.07.2020



Jul 27, 2020 Jul 28, 2020
Field Office Civil Works .... Supply and spreading of Gravel for220 Kv a-3,132 kv bay B-4 and 33kV bay ......................... NIT-10-CWD-2-Vol-XI-HVPNL-2020-21 Dated 12.06.2020



Jul 23, 2020 Jul 24, 2020
Field Office Capital Work Equity Creation of 132 kv Line bay for 2nd circuit of 132 kv Hukmawali - Bhattu Sotter Line at 132 kv S/Stn. Bhattu Sotter. NIT-22-2020-21-XENTS-HSR Dated 14.07.2020



Jul 20, 2020 Jul 21, 2020
Field Office Capital Work Equity Augmentation of 132 kv S/Stn. Cantt. (Hisar) from 1x10/16 MVA, 132/11 kv T/F to (2x10/16 MVA, 132/11 KV T/F) in FY 2018-19. NIT-21-2020-21-XENTS-HSR Dated 14.07.2020



Jul 20, 2020 Jul 21, 2020
Field Office Department Work .... 66kv D/C line Rajokheri- Malikpur one circuit LILO of Rajokheri- Malikpur at 66kv s/stn Adhoya NIT-07-66kv DC Line-2020-21 Dated 13.07.2020



Jul 25, 2020 Jul 27, 2020
Field Office Mtc. E&E Revenue Supply of LED TV, refrigerator and hot water geyser in Guest House, Sector-12A, Panchkula NIT-09-CCD-186-B Dated 02.07.2020



Jul 24, 2020
Field Office Civil Works Departmental Painting of steel structures at 66 KV S/Stn.L/Basti. Painting of steel structures on 12.5 16 Mva ,66/11 kv T-2 T/F & allied equipments at 66 Kv S/Stn Adyoya Painting of steel structures ,Switch yard at 66 Kv S/Station Barara. Painting of power T/F 12 NIT-03-Str.Painting-AMB-2020-21 Dated 29.06.2020



Jul 18, 2020
Field Office Civil Works Capital Construction of additional ODSG & allied civil work for T/F bay at 66kv S/Stn. Majri for Spreading of gravel Regarding NIT-11-CCD-308-Vol-II Dated 10.07.2020



Jul 21, 2020
Field Office Civil Works .... Construction of Boundary wall at 220KV Sub-Station, Badshahpur (Gurugram) NIT-08-CWG-2019-20 Dated 16.01.2020



Aug 4, 2020 Aug 7, 2020
Field Office Electrical Work .... Augmentation of 20/25 MVA 132/33 KV T/F T-1 with 40/50 MVA, 132/33 KV Power T/F at 132 KV S/Stn. HVPNL, Berla Tender ID:- 2020_HBC_132561_1). NIT-05-TS-BHW-2020-21 Dated 19.06.2020



Jul 15, 2020 Jul 16, 2020
Field Office Electrical Work .... Augmentation of 132 KV S/Stn, Behal by providing additional 20/25 MVA 132/33 KV T/F (Tender ID:- 2020_HBC_126400_1). NIT-03-2020-21-XEN-TS-BHW Dated 17.04.2020



Jul 15, 2020 Jul 16, 2020
Field Office Electrical Work .... Augmentation of 16/20 MVA 132/33 KV T/F T-3 with 40/50 MVA, 132/33 KV Power T/F at 132 KV S/Stn. HVPNL, Miran Tender ID:- 2020_HBC_125490_1). NIT-02-2020-21-XEN-TS-BHW Dated 02.04.2020



Jul 15, 2020 Jul 16, 2020
Field Office Department Work .... Augmentation of 66 KV S/Stn Ford from 1x25/31.5MVA + 2X12.5/16 MVA 66/11 KV T/F to 2X25/31.5 + 1x12.5/16MVA 66/11 KV T/F NIT-06-TS-FBD-2020-21 Dated 03.07.2020



Jul 13, 2020
Field Office Audio Visual .... Supply, Installation, Configuration, Testing & Commisioning of Video Conferencing System (Hardware based) in Haryana Vidyut Prasaran Nigam Limited and Setting up of Smart Classroom in HVPNL Power Training Institute NIT-IT-01-2020 Dated 19.06.2020



Jul 15, 2020 Jul 18, 2020
Field Office Transmission line work .... Creation of 66kV D/C line from 220kv S/Stn. Palla, faridabad to 66kV S/Stn. Sector-37 Faridabad.......... NIT-02-PD-C Dated 24.02.2020



Jul 21, 2020
Field Office Transmission line work .... Construction of 220kV 0.5sq” D/C Mund – IOCL line at cost of M/s IOCL NIT-1092 Dated 01.01.2020



Jul 21, 2020
Field Office O&M .... Repair/replace rusted tower stub and member of 66 kV D/C Jorian Ynr line under TL Jorian NIT-20-XEN-TS-YNR-2020-21 Dated 08.07.2020



Jul 20, 2020 Jul 21, 2020
Field Office Civil Works Capital Provision of architectonic structure car parking shed at Shakti Bhawan, HVPNL, Panchkula NIT-10-CCD-383 Dated 08.07.2020



Jul 20, 2020
Head Quarter Bays Domestic Additional 220/33 kV 100 MVA T/f with 33 kV GIS with in the yard of existing 220 kV S/Stn. HSIIDC Bawal on turnkey basis (220/33 kV 100 MVA T/f will be supplied by HVPNL) NIT-1089 Dated 16.12.2019



Jul 21, 2020 Jul 22, 2020
Field Office Electrical Work REC Augmentation of existing 20/25 MVA, 132/33 KV T/F T-2 with 40/50 MVA, 132/33 KV T/F at 132 KV S/Stn., HVPNL, Staundi NIT-20-XEN-TS-KNL-2020-21 Dated 06.07.2020



Jul 15, 2020
Field Office Civil Works .... Providing 132KV double bus bar arrangement along with 132KV bus coupler bay at 132KV S/Stn. Sagga (Civil Work NIT-07-CWK-11-2020-21 Dated 07.07.2020



Jul 21, 2020 Jul 22, 2020
Field Office Civil Works Revenue Maintenance of residential quarters in power colony at 132kV S/stn Panipat NIT-07-TS-PNP-2020-21 Dated 06.07.2020



Jul 20, 2020 Jul 20, 2020
Field Office Civil Works .... Supply and spreading of 25mm to 40mm Gravel in Switch Yard..................Alewa NIT-07-CWD-2-Vol-XI-HVPNL-2020-21 Dated 04.06.2020



Jul 20, 2020 Jul 21, 2020
Field Office Civil Works .... Supply and spreading of 25mm to 40mm Gravel in Switch Yard..................Bibipur NIT-06-CWD-2-Vol-XI-HVPNL-2020-21 Dated 03.06.2020



Jul 20, 2020 Jul 21, 2020
Field Office Electrical Work Departmental For arresting of T/F oil leakage of 12.5/16 MVA,66/11 Kv Power T/F T-1 with Belzona polymeric compound at 66 kv s/stn Jansui & 100 MVA,220/66 Kv Power T/F T-2 at 220 kv s/stn Shahabad (M). NIT-04-Oil Leakage TF-2020-21 Dated 02.07.2020



Jul 9, 2020 Jul 10, 2020
Head Quarter Equipment .... Procurement of various sizes Boltless C-Type Wedge Connectors NIT-1124 Dated 02.07.2020



Aug 6, 2020
Field Office Electrical Work REC Revival of existing 33 KV Bay for 33 KV Uplana at 132 KV S/Stn., HVPNL, Jalmana NIT-18-XEN-TS-KNL-2020-21 Dated 02.07.2020



Jul 10, 2020
Field Office Capital Work Deposit Work Deposit estimate for raising the height of 220 KV S/C PTPS-Karnal transmission line between tower location No. 16 and 17 crossing the railway track of Jind-Panipat section (Location Madlauda-Assan Section of Northern Railway) under TS Divn., HVPNL, K NIT-19-XEN-TS-KNL-2020-21 Dated 02.07.2020



Jul 17, 2020
Field Office Capital Work Equity HOT CHARGE 40/50 MVA, 132/33 KV power T/F at 132 KV S/Stn. Fatehabad during the year 2020-21 (OnlineTender ID- 2020_HBC_134128_1) NIT-20-2020-21-XENTS-HSR Dated 02.07.2020



Jul 8, 2020 Jul 9, 2020
Field Office Electrical Work Departmental For arresting of T/F oil leakage of 12.5/16 MVA,66/11 Kv Power T/F T-2 with Belzona polymeric compound at 66 kv s/stn Mullana & 100 MVA,220/66 Kv Power T/F T-1 at 220 kv s/stn Sonta. NIT-02-Oil Leakage TF-2020-21 Dated 22.06.2020



Jul 7, 2020
Head Quarter Equipment .... Procurement of 65 no. Digital Insulation Resistance Test Kits (suitable for use upto 220KV S/Stns.) – Refloating of dropped e-Tender enquiry no. QDP-1208. NIT-1121 Dated 30.06.2020



Aug 4, 2020
Head Quarter Equipment .... Procurement of ACSR Wolf Conductor NIT-1120 Dated 30.06.2020



Aug 4, 2020
Head Quarter Equipment .... Procurement of 220V, 200Ah & 220V, 100Ah VRLA type Battery Bank NIT-1118 Dated 29.06.2020



Jul 30, 2020
Head Quarter Equipment .... Procurement of 220V, 200 AH, 20A/30A battery charger NIT-1117 Dated 29.06.2020



Jul 30, 2020
Head Quarter Equipment NABARD 66 KV Capacitor C&R Panels, T/F C&R Panel (for 66kV & 132kV), Feeder C&R Panel (for 66kV & 132kV) NIT-1115 Dated 26.06.2020



Jul 30, 2020
Field Office Electrical Work .... Replacement of PCC poles, LT conductors with new cables of 200 KV T/F Near 220 KV S/Stn. at Power House Colony, HVPNL, Karnal NIT-17-XEN-TS-KNL-2020-21 Dated 30.06.2020



Jul 13, 2020
Field Office Capital Work .... Replacement of 7 no. old & obsolete design and problematic air pneumatic 220 kV Circuit breakers with new 220 kV breakers at 220 kV S/Stn. HVPNL, Jorian NIT-19-XEN-TS-YNR-2020-21 Dated 30.06.2020



Jul 7, 2020 Jul 8, 2020
Field Office Outsource Services .... Providing 01 no. Peon for SE TS Circle, HVPNL, Karnal (For the period 01-07-2020 to 31-03-2021) NIT-16-XEN-TS-KNL-2020-21 Dated 30.06.2020



Jul 6, 2020
Field Office Capital Work .... Shifting of 66 KV S/C Khera – Chhachhrauli line from the Premises District Jail Yamuna Nagar ( Deposit Work ) NIT-18-XEN-TS-YNR-2020-21 Dated 29.06.2020



Jul 6, 2020 Jul 7, 2020
Field Office Department Work .... Repair & Maintenance of Residential Colony at 220KV S/Stn. A5 HVPNL, Faridabad NIT-03-TS-FBD-2020-21 Dated 21.05.2020



Jul 9, 2020 Jul 10, 2020
Field Office Civil Works Capital Creation of double bus bar arrangement along with 2 no. bays and bus coupler arrangement at 66KV S/Stn. Mullana to accommodate 66kv D/C Rajokheri-Mullana line by HVPNL in FY 2019-20. NIT-05-CCD-242-Vol-I Dated 20.05.2020



Jul 7, 2020
Field Office Civil Works Capital Work of Oil bound Distempering, Synthetic enamel painting and exterior emulsion painting etc. at Shakti Bhawan complex, sector-6 HVPNL, Panchkula NIT-07-CCD-388-Vol-I Dated 24.06.2020



Jul 7, 2020
Field Office Civil Works Capital Work of Oil bound Distempering, Synthetic enamel painting and exterior emulsion painting etc. at Shakti Bhawan complex, sector-6 HVPNL, Panchkula NIT-06-CCD-388-Vol-I Dated 16.06.2020



Jun 26, 2020
Field Office Civil Works Civil Mtc. 74.2 Maintenance of 132 KV S/Stn., HVPNL, Karnal at 220/132 KV S/Stn. Power House Colony, Karnal NIT-15-2020-21-XEN-TS-KNL Dated 23.06.2020



Jul 6, 2020
Field Office Equipment NABARD 66/11KV, 25/31.5MVA Power Transformer NIT-1114 Dated 22.06.2020



Jul 24, 2020
Field Office Equipment NABARD 66 kV CAPACITIVE VOLTAGE TRANSFORMER NIT-1110 Dated 21.04.2020



Jul 3, 2020
Head Quarter Equipment .... 220/132KV, 160MVA Power Transformer NIT-1096 Dated 17.01.2020



Jul 6, 2020
Field Office Civil Works .... Major Mtc. of Switch House Building, ODCT & Misc. works at 220KV S/Stn. Badshahpur (Gurugram) NIT-17-CWG-2019-20 Dated 02.03.2020



Jul 10, 2020 Jul 15, 2020
Field Office Civil Works .... Construction of 01 No. T/F Plinth ODSG, ODCT at 66KV Sub-Station, Sector-34/35, Gurugram - (Online Tender ID 2019_HBC-104824_1) NIT-14-CWG-2019-2020 Dated 13.02.2020



Jul 10, 2020 Jul 15, 2020
Field Office Dept. SSTN .... Supply & Spreading of Gravel and laying of PCC at 132KV S/Stn Machrauli NIT-03-CWR-2020-21 Dated 18.06.2020



Jul 2, 2020
Field Office GIS S/Stn. Domestic Construction of 66 kV GIS S/stn Sec-59 Faridabad with 2x25/31.5 MVA 66/11 kV Power Transformers (2x25/31.5 MVA 66/11kV T/f will be supplied by HVPNL) on Turnkey basis NIT-01-PD&C Dated 12.02.2020



Jun 30, 2020 Jul 2, 2020
Field Office Civil Works Capital Construction of IDCT at 66 KV S/Stn. Sector-64 Ballabgarh. NIT-07-CWFG-25-Vol.IV-2020-21 Dated 29.04.2020



Jul 1, 2020
Field Office Civil Works Capital Construction of 1 No. 12.5/16 MVA T/F Plinth Foundation, OSDG Foundations, ODCT,Fire wall & U/C Fencing at 66KV S/Stn USA Faridabad (R-2 & R-3) NIT-05-CWFG-25-Vol.IV-2020-21 Dated 20.04.2020



Jul 8, 2020
Field Office Civil Works Capital Estimate for Construction of additional ODSG Foundations, ODCT for 1 nos. line bays C-9 & as revision R-6 at 220 KV S/Stn. Mirpur kaurali , Palwal NIT-09-CWFG-25-Vol.IV-2020-21 Dated 01.05.2020



Jul 8, 2020
Field Office Equipment NABARD 33KV Simplex Feeder C&R Panel 33KV Simplex I/C T/F C&R Panel NIT-1112 Dated 16.06.2020



Jul 21, 2020
Field Office Capital Work Equity Creation of 132kV Line bay for 2nd circuit of 132kV Hukmawali – Bhattu Sotter line at 220kV Sub-station Hukumawali. (Online Tender ID 2020_HBC_130207_1) NIT-17-2020-21-XENTS-HSR Dated 01.06.2020



Jun 23, 2020 Jun 24, 2020
Field Office Capital Work Equity Creation of 1 No. 132kV Line bay at 132 Kv S/Stn. Arya Nagar to accommodate 132 KV Bhojraj- Arya Nagar line on S/C towers. (Online Tender ID- 2020_HBC_130205_1) NIT-16-2020-21-XENTS-HSR Dated 01.06.2020



Jun 23, 2020 Jun 24, 2020
Field Office Capital Work Equity Creation of 1No. 33 kV Bay at132 kV S/Stn. Teliwara for independent feeding of 33 KV S/Stn. Babanpur . (Online TenderID- 2020_HBC_130208_1). NIT-18-2020-21-XENTS-HSR Dated 01.06.2020



Jun 15, 2020 Jun 16, 2020
Field Office Capital Work Equity Creation of 132kV Line bay for 2nd circuit of 132kV Hukmawali – Bhattu Sotter line at 132kV Sub-station Bhattu Sotter. (Online Tender ID 2020_HBC_125427_1 NIT-01-2020-21-XENTS-HSR Dated 01.04.2020



May 8, 2020 May 11, 2020
Field Office Capital Work Equity Construction of 1 no. 33 kv line bay at 132 kv S/Stn. Chander Khurd to feed 33 kv S/Stn. Gullarwala. (Online TenderID- 2020_HBC_127518_1). NIT-13-2020-21-XENTS-HSR Dated 04.05.2020



Jun 8, 2020 Jun 9, 2020
Field Office Capital Work Equity Erection of hot charge 16/20 MVA, 132/11kv T/F and allied equipments and structure at 220 kv S/Stn. IA, Hisar. (Online ender ID-2020_HBC_127508_1). NIT-12-2020-21-XENTS-HSR Dated 04.05.2020



Jun 2, 2020 Jun 3, 2020
Field Office Civil Works Capital Repair of washroom/toilets, to give complete renovated and aesthetic look at whole, at Shakti Bhawan building, HVPNL, Panchkula. NIT-04-CCD-344-Vol-VI Dated 18.05.2020



Jun 22, 2020
Field Office Civil Works .... Creation of 1 No. 33KV bay and capacitor bank at 132 KV S/Stn. Malikpur. (Site Surfacing, dressing, supply and spreading of crushed bajri) (Civil Works) NIT-07-CWK-11-2020-21 Dated 12.06.2020



Jul 1, 2020 Jul 2, 2020
Field Office Civil Mtc. Revenue Outsourcing activities of general maintenance of residential and non-residential building, arboriculture/horticultureincluding cleaning & sweeping and security arrangements in colonies, offices and rest house situatd at 132 KV S/Stn HVPNL Campus, BTM NIT-04-TS-BHW Dated 18.05.2020



Jun 11, 2020 Jun 12, 2020
Field Office Department Work .... Augmentation of 66 KV S/Stn Oswal Steel from 1x25/31.5MVA + 2X12.5/16 MVA 66/11 KV T/F to 2X25/31.5 + 1x12.5/16MVA 66/11 KV T/F NIT-05-TS-FBD-2020-21 Dated 09.06.2020



Jun 16, 2020
Field Office Electrical Work .... Augmentation of 20/25 MVA 132/33 KV T/F T-1 with 40/50 MVA, 132/33 KV Power T/F at 132 KV S/Stn. HVPNL, Berla Tender ID:- 2020_HBC_125485_1). NIT-01-2020-21-XEN-TS-BHW Dated 02.04.2020



Jun 11, 2020 Jun 12, 2020