Tender

Location Type Funding Description NIT NO. Corrigendum No. Date-of-Submission Date-of-Opening
Head Quarter Equipment .... Procurement of various 66 kV Current Transformers NIT-1087 Dated 21.11.2019



Jan 31, 2020
Field Office Civil Works .... Construction of Boundary wall at 220KV Sub-Station, Badshahpur (Gurugram) NIT-09-CWG--2019-20 Dated 16.01.2020



Feb 6, 2020 Feb 11, 2020
Field Office Civil Works .... Construction of Boundary wall at 220KV Sub-Station, Badshahpur (Gurugram) NIT-08-CWG--2019-20 Dated 16.01.2020



Feb 6, 2020 Feb 11, 2020
Field Office Equipment .... 220/132KV, 160MVA Power Transformer NIT-1096 Dated 17.01.2020



Feb 20, 2020
Field Office Equipment .... Rate Contract for 1 year for procurement of various sizes of un-armoured copper control cables NIT-1094 Dated 16.01.2020



Feb 19, 2020 Feb 19, 2020
Field Office Civil Works Revenue Maintenance of newly alloted quarters and old quarters in power colony and construction of foot steps at 132kV S/stn Panipat NIT-40-TS-Divn.-PNP-2019-20 Dated 16.01.2020



Jan 31, 2020 Jan 31, 2020
Field Office Civil Works .... White washing, Dis tempering and other allied civil maintenance work of switch house building at 66 KV S/Stn Sohna, HVPNL, Palwal NIT-16-XEN-TS-PWL-2019-20 Dated 27.12.2019



Jan 27, 2020 Jan 27, 2020
Field Office Civil Works .... Extension of Switch House Building, Indoor Cable Trenches at 66KV Sub-Station,Sector-51, Gurugram NIT-04-CWG-2019-20 Dated 06.11.2019



Feb 5, 2020 Feb 10, 2020
Field Office Civil Works Capital Construction of 1 No. 12.5/16 MVA T/F Plinth Foundation, OSDG Foundations, ODCT,Fire wall & U/C Fencing at 66KV S/Stn USA Faridabad (R-2 & R-3) NIT-12-CWFG-25-Vol.III-2019-20 Dated 15.01.2020



Feb 3, 2020 Feb 3, 2020
Field Office Department Work .... Repair, Maintenance , PVC wall panelling,rusted fencing & White Washing & Mtc.of NRB at 66kV Sub Station Mullana, Barara,Tepla(220kv) ,Mohra and sonda. NIT-24-AMB-Civil-Works-2019-20 Dated 10.12.2019



Jan 25, 2020 Jan 27, 2020
Field Office Vehicle Outsourcing .... Outsourcing of Vehicles under TS Circle, HVPNL, Hisar for FY 2019-20. (2020_HBC_115145_1) NIT-09-OMHW- 41-VIII 2019-20 Dated 15.01.2020



Jan 24, 2020 Jan 24, 2020
Field Office Electrical Work .... Creation of double bus bar arrangement along with the 3 Nos. 66KV line bays and bus coupler arrangement at 66kv S/Stn. Adhoya to accommodate 66kv D/C Rajokheri – MaliKpur line at 66kv S/Stn. Adhoya NIT-27-66 kv Line Bay Adhoya-2019-20 Dated 15.01.2020



Jan 31, 2020
Field Office TurnKey SSTN .... Construction of 132KV S/Stn. Hansi alongwith termination arrangement of 132KV Circuits i.e. 132KV Masudpur-Hansi and 132KV Hansi- Bhiwani at 132KV Substation Hansi NIT-1093 Dated 14.01.2020



May 3, 2020 Mar 5, 2020
Field Office Civil Works Civil Mtc. 74.2 Providing new fencing work in place of old and defective portion of fencing work of switchyard at 66 kV S/Stn HVPNL, Radaur NIT-23-TSYNR-2019-20 Dated 14.01.2020



Feb 5, 2020 Feb 6, 2020
Field Office Transmission line work .... Painting of un-galvanized towers of 66 kV S/C Govindpuri – Papermill -Chandpur transmission line (With labour & material) NIT-22-TSYNR-2019-20 Dated 14.01.2020



Feb 4, 2020 Feb 5, 2020
Field Office Dept. SSTN .... Making of trench cover for yard trench of 132KV S/Stn. Sec.-03, Rohtak NIT-08-XEN-TS-RTK-2019-20 Dated 09.09.2019



Jan 13, 2020 Jan 14, 2020
Head Quarter Civil Works Domestic Aug. of 66kv S/Stn. Sec-15,Jagadhari from 2x12.5/16 MVA 66/11kv to (2x12.5/16+ 1x10/12.5)MVA 66/11kv T/F-Construction of add. ODSG foundation, ODCT and allied equipments for T/F plinth T-3 with 02 no. anti fire wall at 66kv S/Stn. Sec-15, Jagadhari NIT-10-CCD-274 Dated 20.12.2019



Jan 14, 2020
Field Office Dept. SSTN .... Creation of 2no. 220 kv (AIS) line bays at 220 kv Badhana as a deposit work of M/s METL for 220 kv D/C line by HVPN from 220 kv S/Stn. Badhana to proposed 220 kv S/Stn. Of M/s METL in village dadri Toe, Jhajjar on double circuit towers with ACSR moos NIT-12-CWR 2019-20 Dated 14.01.2020



Feb 5, 2020
Field Office Dept. SSTN .... Construction of boundary wall and U/C fencing at 220 KV S/Stn. HVPNL Rohtak. NIT-11-CWR 2019-20 Dated 13.01.2020



Feb 4, 2020
Field Office Dept. SSTN .... Supply & Spreading of Gravel and PCC in B-5,D-5,D-6,D-7,D-8 in 132KV and 33KV Bay at 132KV Bhanderi NIT-10-CWR 2019-20 Dated 13.01.2020



Feb 4, 2020
Field Office Dept. SSTN .... Augmentation of 132KV S/Stn Assaudha from 1x20/25MVA 132/33KV T/F to (1x20+1x40/50)MVA 132/33KV T/F Const. of 01No.T/F Plinth, Addl. ODSG Foundation, ODCT, E/Filling, Road at 132KV S/Stn Assaudha NIT-06-CWR 2019-20 Dated 10.12.2019



Jan 20, 2020 Jan 21, 2020
Field Office Civil Works Capital Strengthing 100 MVA T/F Plinth into 160 MVA Transformer Plinth at 220KV Sub Station Palwal NIT-11-CWFG-25-Vol.III-2019-20 Dated 13.01.2020



Feb 3, 2020 Feb 3, 2020
Field Office Department Work .... Creation of LILO of both circuits of 66KV D/C Palla-NH3 line at 66KV S/Stn. Sector-21D HVPNL, Faridabad NIT-12-TS-FBD-2019-20 Dated 10.01.2020



Jan 18, 2020 Jan 20, 2020
Field Office Electrical Work .... For arresting of T/F oil leakage of 8 MVA,66/11 Kv Power T/F T-1 & 12.5/16 MVA,66/11 Kv Power T/F T-3 with Belzona polymeric compound at 66 kv s/stn Barara and 100 MVA, 220/66 Kv Power T/F T-3 at 220 kV S/Stn Tepla NIT-26-Oil Leakage Barara-T/F-2019-20 Dated 10.01.2020



Jan 27, 2020
Field Office Department Work .... Creation of 1 No. 66KV Line Bay to accommodate LILO of one ckt of 66KV Palla-NH-3 line alongwith double bus arrangement at 66KV S/Stn USA NIT-04-TS-FBD-2019-20 Dated 15.11.2019



Jan 13, 2020
Field Office Department Work .... Augmentation of 66KV S/Stn Chhainsa from 1x12.5/16 MVA + 1x25/31.5MVA 66/11KV T/F to 2x25/31.5 MVA 66/11KV T/F NIT-03-TS-FBD-2019-20 Dated 15.11.2019



Jan 13, 2020
Field Office Department Work .... Augmentation of 66KV S/Stn Escorts-II from 2x12.5/16 MVA 66/11KV T/F to 1x12.5/16MVA + 1x25/31.5 MVA 66/11KV T/F NIT-02-TS-FBD-2019-20 Dated 15.11.2019



Jan 13, 2020
Field Office Department Work .... Creation of 2 Nos. 220KV Line Bays at 400KV S/Stn Nawada to accommodate 220KV D/C Line from 400KV S/Stn Nawada to 220KV TSS DFCCIL NIT-01-TS-FBD-2019-20 Dated 15.11.2019



Jan 13, 2020
Field Office Dept. SSTN .... Raising the height of existing of 132KV S/C Khokhrakote-Sector-3 Rohtak line between TL No. 11-12 due to Under construction elevated railways corridor on Rohtak-Gohana railway track NIT-20-XEN-TS-RTK Dated.18.12.2019



Jan 16, 2020 Jan 17, 2020
Field Office Dept. SSTN .... Raising the height of existing of 132KV S/C Kalanaur-Meham line on D/C towers line between TL No. 45-46 due to proposed railways crossing (at KM-24/200-300) in village Bahlamba on Rohtak-Meham-Hansi railway line NIT-19-XEN-TS-RTK Dated 18.12.2019



Jan 16, 2020 Jan 17, 2020
Field Office Equipment REC PROCUREMENT OF 66 Kv LAs and 220 Kv LAs NIT-1084 Dated 13.11.2019



Jan 21, 2020
Field Office Transmission line work .... Remaining works of 220 kV & 132 kV lines associated with 220 kV GIS S/stn. HSIIDC, Rai in Sonepat area NIT-1088 Dated 22.11.2019



Jan 21, 2020
Field Office Civil Works Civil Mtc. 74.2 Supply and stacking of gravel/crushed stone at 66 kV S/Stn. HVPNL, Ladwa NIT-21-TSYNR-2019-20 Dated 07.01.2020



Jan 28, 2020 Jan 29, 2020
Field Office O&M .... Scrapping and painting of power transformer and steel structures and other bay equipments, earth flats & demarcation of colors codes in the switch yard at 66 kV S/Stn. HVPNL, Talakaur NIT-19-TSYNR-2019-20 Dated 24.12.2019



Jan 15, 2020
Field Office Electrical Work .... Raising the height of 132kV S/C Pehowa-Malikpur line in the affected portion of tower location no. 20&21 to achieve the proper ground clearance as the same has been affected/decreased due to up-gradation of Ambala-Hisar road to Dhanirampura road (ROA NIT-37-EG-70-2019-20 Dated 06.01.2020



Jan 15, 2020
Field Office Civil Works .... Construction of IDCT & ODCT, Miscellaneous work at 66KV S/Stn. Sector-28 Gurugram NIT-07-CWG--2019-20 Dated 12.12.2019



Jan 24, 2020 Jan 21, 2020
Field Office Civil Works .... Construction of Anti-Fire wall at 220KV Sub-Station, Sector-69 Gurugram NIT-06-CWG--2019-20 Dated 12.12.2019



Jan 21, 2020 Jan 24, 2020
Field Office Dept. SSTN .... Repair & maintenance of 132 kV Colony at 132 kV Sub Station Khokhrakot, Rohtak NIT-08-CWR 2019-20 Dated 16.12.2019



Jan 9, 2020 Jan 10, 2020
Field Office Civil Works .... Repair & maintenance of 220 kV Colony at 220 kV Sub Station HVPNL, Rohtak. NIT-07-CWR-2019-20 Dated 12.12.2019



Jan 9, 2020 Jan 10, 2020
Field Office Transmission line work .... Construction of 220kV 0.5sq” D/C Mund – IOCL line at cost of M/s IOCL NIT-1092 Dated 01.01.2020



Jan 15, 2020 Jan 17, 2020
Field Office Dept. SSTN .... 2. Augmentation of 12.5 MVA, 132/33 KV T/F by 40/50 MVA, 132/33 KV Power T/F at 132 KV S/Stn. Matanhail NIT-18-2019-20-XEN-TS-RTK Dated 10.12.2019



Jan 9, 2020 Jan 10, 2020
Field Office Dept. SSTN .... Augmentation of 20/25 MVA, 132/33 KV T/F by 40/50 MVA, 132/33 KV Power T/F at 132 KV S/Stn.HVPN Jhajjar NIT-17-2019-20-XEN-TS-RTK Dated 10.12.2019



Jan 9, 2020 Jan 10, 2020
Field Office Equipment .... 220 KV CIRCUIT BREAKER & 66KV CIRCUIT BREAKER NIT-1086 Dated 21.11.2019



Jan 20, 2020
Field Office Equipment REC Procurement of Special Energy Meters (SEMS) NIT-1085 Dated 13.11.2019



Jan 15, 2020
Field Office Department Work .... Augmentation of 66 KV S/Stn Fatehpur Biloch from existing capacity of 1X12.5/16 MVA + 1x8MVA 66/11 KV T/F to 2x12.5/16MVA 66/11 KV T/F NIT-10-TS-FBD-2019-20 Dated 01.01.2020



Jan 15, 2020 Jan 17, 2020
Field Office Department Work .... Maintenance of old Control Room Building at 66 KV S/Stn. Sector 46 HVPNL, Faridabad. NIT-09-TS-FBD-2019-20 Dated 01.01.2020



Jan 15, 2020 Jan 17, 2020
Field Office Department Work .... Painting of Control Room Building and boundary wall along with minor repairs at 66 KV S/Stn. Sector 31 HVPNL, Faridabad NIT-08-TS-FBD-2019-20 Dated 01.01.2020



Jan 15, 2020 Jan 17, 2020
Field Office Dept. SSTN .... Making of trench cover for yard trench of 132KV S/Stn. Jhajjar NIT-15-XEN-TS-RTK-2019-20 Dated 10.12.2019



Jan 6, 2020
Field Office Civil Works .... Construction of new U/C boundary wall against damaged wall at 132kV Sub-Station Narnaund NIT-10-CWD-2-Vol.-X-HVPN-2019-20 Dated 09.12.2019



Jan 15, 2020 Jan 16, 2020
Field Office Dept. SSTN .... Repair and maintenance of Non Residential Building at 220 kv Sub Station HVPN Nuna - Majra (B.garh) NIT-13-XEN-TS-RTK-2019-20 Dated 03.12.2019



Jan 20, 2020
Field Office Civil Works Civil Mtc. 74.2 White wash R.B. at 220 kV S/Stn. Jorian, white wash NRB at 66 kV S/Stn. Rattangarh & Tile Terracing at 66 kV S/Stn. Babain NIT-20-TSYNR-2019-20 Dated 31.12.2019



Jan 20, 2020 Jan 21, 2020
Field Office Dept. SSTN Augmentation Capital Augmentation of 66KV S/Stn NH-3 from 2x25/31.5MVA 66/11KV T/F to 3x25/31.5MVA 66/11KV T/F NIT-22-TS-FBD-2018-19 Dated. 22.02.2019



Jan 10, 2020 Jan 10, 2020
Field Office Department Work .... Augmentation of 66KV S/Stn USA from 1x12.5/16MVA + 1x25/31.5MVA 66/11KV T/F + 1x20/25MVA 66/33KV T/F to 2x25/31.5MVA + 1x20/25MVA 66/33KV T/F NIT-07-TS-FBD-2019-20 Dated 13.12.2019



Jan 8, 2020 Jan 10, 2020
Field Office Department Work .... Augmentation of 66KV S/Stn Dabriwala from existing capacity of 1x16/20MVA + 1x12.5/16MVA 66/11KV T/F to 1x16/20MVA + 1x25/31.5MVA 66/11KV T/F alongwith allied equipments of compatible rating NIT-05-TS-FBD-2019-20 Dated 13.12.2019



Jan 8, 2020 Jan 10, 2020
Field Office Department Work .... Augmentation of 66 KV S/Stn Escorts-I from 2X12.5/16 MVA 66/11 KV T/F to 1X25/31.5 + 1x12.5/16MVA 66/11 KV T/F NIT-06-TS-FBD-2019-20 Dated 13.12.2019



Jan 8, 2020 Jan 10, 2020
Field Office Civil Works .... White washing, Dis-tempering and other allied civil maintenance work of switch house building at 66 KV S/Stn Baghola, HVPNL, Palwal NIT-15-XEN-TS-PWL-2019-20 Dated 23.12.2019



Jan 13, 2020 Jan 13, 2020
Field Office Dept. SSTN .... Providing additional 20/25 MVA, 132/33 KV T/F with 132 & 33 KV Bays at 132 KV S/Stn.Bhanderi NIT-11-XEN-TS-RTK-2019-20 Dated 20.11.2019



Jan 2, 2020 Jan 3, 2020
Field Office Civil Works .... For Creation of one No. 132KV Bay at 220KV S/Stn. Unispur to accommodate 2nd circuit of existing 132KV Unispur-Kirmich S/C line on D/C towers(Civil Works). NIT-16-CWK-11-2019-20 Dated 23.12.2019



Dec 30, 2019 Dec 31, 2019
Field Office Civil Works REC Creation of two (2) 66 KV bays at 220 KV S/Stn. Salempur to accomdate 66 KV D/C (0.4Sq." ACSR) Salempur -Basantpur Line (site surfacing, dressing supply and spreading of crushed bajri (Civil Works) NIT-15-CWK-11-2019-20 Dated 23.12.2019



Dec 30, 2019 Dec 31, 2019
Field Office Civil Works .... Construction of additional ODSG foundation ODCT, 1 No. 20/26 MVA .............132 kV S/Stn. Bhiwani Old NIT-12-CWD-2-Vol.-X-HVPN-2019-20 Dated 23.12.2019



Jan 15, 2020 Jan 16, 2020
Head Quarter Transmission line work Domestic Construction of 220kV 0.5sq” D/C Mund – IOCL line at cost of M/s IOCL NIT-1091 Dated 20.12.2019



Feb 3, 2020 Feb 5, 2020
Field Office Civil Works .... Extension of Switch House Building, Indoor Cable Trenches at 66KV Sub-Station, Sector-43, Gurugram NIT-05-CWG-2019-20 Dated 29.11.2019



Jan 3, 2020 Jan 7, 2020
Head Quarter GIS S/Stn. Domestic Construction of 66 kV GIS S/stn Sec-37 Faridabad with 2x25/31.5 MVA 66/11 kV Power Transformers (2x25/31.5 MVA 66/11kV T/f will be supplied by HVPNL) on Turnkey basis NIT-1090 Dated 19.12.2019



Jan 22, 2020 Jan 24, 2020
Field Office Dept. SSTN .... Providing outsourcing services regarding general maintenance and up keep of residential and non-residential building, cleaning of roads, path, drain, arboriculture arrangement, water supply & sewerage system and watch and ward at 132 KV Power House C NIT-16-XEN-TS-RTK-2019-20 Dated 10.12.2019



Dec 23, 2019 Dec 24, 2019
Field Office Dept. SSTN .... Water supply arrangement for pouring of water in various earth pits at 220 kV S/Stn., HVPNL, Nuna Majra ,Bahadurgarh NIT-22-XEN-TS-RTK Dated.18.12.2019



Jan 9, 2020 Jan 10, 2020
Field Office Dept. SSTN .... Whitewash & repair of the control room building (NRB) at 132 kV S/Stn., HVPNL, Assaudha NIT-21-XEN-TS-RTK Dated.18.12.2019



Jan 9, 2020 Jan 10, 2020
Field Office Electrical Work .... Replacement of 72.5KV SF-6 Breaker GCB against defective at 66KV S/Stn, Adhoya NIT-25-SF-6-Breaker Adhoya-2019-20 Dated 17.12.2019



Dec 26, 2019 Dec 27, 2019
Field Office Dept. SSTN .... Replacement of defective gas kits and stoppage oil leakage from 20/25MVA,132/33 KV T/F’s at 132 kv S/Stn. HVPNL B.Garh& 132 KV S/Stn. HSIIDC Rohtak NIT-12-XEN-TS-RTK-2019-20 Dated 21.11.2019



Dec 23, 2019 Dec 24, 2019
Field Office Dept. SSTN .... Const. of Hot T/F Plinth at 220 KV S/Stn. HVPNL Nuna Majra (B.Garh) NIT-09-CWR 2019-20 Dated 17.12.2019



Dec 30, 2019 Dec 31, 2019
Field Office O&M .... Scrapping and painting of T/F and other bay equipment, earth flats along with demarcation of colors codes in the switch yard at 66 KV S/Stn Basantpura. NIT-18-TSYNR- 2019-20 Dated 16.12.2019



Jan 5, 2020 Jan 6, 2020
Head Quarter Bays Domestic Additional 220/33 kV 100 MVA T/f with 33 kV GIS with in the yard of existing 220 kV S/Stn. HSIIDC Bawal on turnkey basis (220/33 kV 100 MVA T/f will be supplied by HVPNL) NIT-1089 Dated 16.12.2019



Jan 31, 2019 Feb 4, 2019
Field Office Civil Mtc. Revenue Furnishing of Hostel Rooms and Lecture Halls at HVPN Power Training Institute (HPTI), Sector-26, Panchkula NIT-07-CCD-286-Vol.-IX-2019-20 Dated 19.09.2019



Jan 1, 2020
Field Office Civil Works REC Extension switch house building at 66 Kv S/stn. Partap Steel Faridabad NIT-09-CWFG-25-Vol.III-2019-20 Dated 12.12.2019



Dec 30, 2019 Dec 30, 2019
Field Office Civil Works Capital Construction extension of switch house building at 220 KV S/Stn. Pali NIT-10-CWFG-25-Vol.III-2019-20 Dated 12.12.2019



Dec 30, 2019 Dec 30, 2019
Field Office Civil Works .... Construction of Front and Back Open area of quarters at 220-132KV S/Stn., Power House Colony, HVPNL, Karnal NIT-67-TSKNL-2019-20 Dated 10.12.2019



Dec 20, 2019 Dec 20, 2019
Field Office Dept. SSTN .... Providing 1No. 132KV Bay to feed 132KV S/Stn HSIIDC Bahadurgarh at 220 KV S/Stn. Nuna Majra. NIT-10-XEN-TS-RTK-2019-20 Dated 15.11.2019



Dec 23, 2019 Dec 24, 2019
Field Office Civil Works Revenue Painting of Control Room Building with minor repairs, providing aluminum doors at main and Yard entrance, electrical wiring, 200 mm thick CC layer, CC Road, Main gate, Providing covers on uncovered length of trenches, repairing, raising height of exi NIT-08-CWFG-25-Vol.III-2019-20 Dated 09.12.2019



Dec 30, 2019 Dec 30, 2019
Field Office Civil Works Capital Construction of ODSG foundations & extension of control room building under augmentation of 66/11 kV T/F 2x12.5x16 MVA to 3x12.5x16 MVA alongwith extension of SH building at 66kv S/Stn. Shahzadpur NIT-06-CCD-168B-2019-20 Dated 20.09.2019



Dec 20, 2019
Field Office Civil Works .... Repair sewerage cleaning of choke sewerage line at 66kV Substation Adhoya.(94000) Maintainance & repair of T/F plinth of T-1,T-2& T-3 in switch yard at 66kv Sub Station Barara.(18800) Repair, ,maintenance & tileflooring in NRB at 66KV....... NIT-05-AMB-Civil Works-2019-20 Dated 19.11.2019



Dec 24, 2019
Field Office Civil Works .... Providing 1no. 40/50MVA 132/33KV T/F (Hot) , a fire wall and allied Civil Works at 132 KV S/Stn. HSIIDC Panipat. NIT-10-CWS-2019-20 Dated 06.12.2019



Nov 19, 2019 Nov 21, 2019
Field Office Civil Works .... For Providing 132 KV Line Bays at B-4 (to 132KV Ismilabad 2nd ckt ) along with allied equipments at 132KV S/stn. Bhusthla. NIT-14-CWK-11-2019-20 Dated 06.12.2019



Dec 23, 2019 Dec 24, 2019
Field Office Civil Works .... Painting of Residential quarter Type-I 48 Nos. & 32 Nos. Type-II at 220/132KV S/Stn., HVPNL, Power House Colony, Karnal. NIT-66-TSKNL-2019-20 Dated 06.12.2019



Dec 17, 2019 Dec 17, 2019
Field Office Outsource Services .... Providing outsourcing services regarding general maintenance and up keep of Residential and Non-Residential Buildings rest houses including, Water Supply, Sewerage System, Storm Water, Drainage System, Road, Path at 220-132 KV SStn. PH Cly, knl NIT-65-TSKNL-2019-20 Dated 26.11.2019



Dec 6, 2019 Dec 6, 2019
Field Office Dept. SSTN .... Const. of addl. ODSG foundation, ODCT etc. (civil works only) for 2nd circuit HSIIDC bay at 220 kv S/Stn. Nuna Majra NIT-05-CWR-2019-20 Dated 29.10.2019



Dec 23, 2019 Dec 24, 2019
Field Office Civil Works .... For Creation of 1 no. 132KV Bay to accommodate one circuit of 132KV Kaithal-Pai S/C Line on D/C Tower 0.4Sq inch ACSR conductor at 132KV S/Stn. Pai.( Surface dressing, NIT-13-CWK-11-2019-20 Dated 04.12.2019



Dec 16, 2019 Dec 17, 2019
Field Office Service Works .... Providing Mess Services in HPTI Sector- 26 Panchkula NIT-06-HPTI-MESS-2019-20 Dated 03.12.2019



Dec 19, 2019 Dec 20, 2019
Field Office Dept. SSTN .... Plugging of oil leakage from 132/33 kV 20-25 MVA T/F T-2 at 132 kV S/Stn., HVPNL, Sector-3, Rohtak NIT-14-XEN-TS-RTK-2019-20 Dated 03.12.2019



Dec 16, 2019 Dec 17, 2019
Field Office Electrical Work .... Creation of 2 No. 66KV bays at 220 kv S/Stn. Tepla to accommodate 66KV D/C Tepla (220KV)- 12 Cross Road Ambala Cantt Lin NIT-23-66Kv Line Bay Tepla-2019-20 Dated 03.12.2019



Dec 21, 2019 Dec 23, 2019
Head Quarter Transmission line work Domestic Creation of 220kV D/C line on M/C towers from 400kV S/Stn. Prithla to 220kV S/Stn. Sector - 78, Faridabad NIT-1080 Dated 03.09.2019



Dec 11, 2019
Head Quarter Transmission line work Domestic Creation of LILO of both circuits of 220kV Pali – Sector 56 D/C line on M/C & D/C towers with 0.4sq inch AL-59 conductor at 400kV substation Kadarpur along with augmentation of balance 0.4 sq. inch ACSR conductor of 220kV Sector 56 to LILO Point .. NIT-1079 Dated 03.09.2019



Dec 11, 2019
Field Office Dept. SSTN .... Providing outsourcing services regarding general maintenance and up keep of residential and non-residential building, cleaning of roads, path, drain, arboriculture arrangement, water supply & sewerage system and watch and ward at 132 KV Power House C NIT-09-XEN-TS-RTK-2019-20 Dated 04.11.2019



Dec 2, 2019
Field Office Capital Work .... Augmentation of 66 KV S/Stn Jathlana from (2x12.5/16MVA) to (1x12.5/16MVA + 1x25/31.5 MVA) 66/11KV Transformers NIT-17-TSYNR- 2019-20 Dated 02.12.2019



Dec 10, 2019
Field Office Civil Works .... White Washing & Mtc.of NRB at 66kV Sub Station Nalvi Mtc. & White-Washing of RB at 66 Kv s/stn Babyal Repair,mtc. & white washing of NRB at 66 kv S/Stn Shahabad Repair,mtc. & white washing of NRB at 66 kv S/Stn Ugala Maintenance & renovation of off NIT-22-AMB-Civil Works-2019-20 Dated 02.12.2019



Dec 16, 2019 Dec 17, 2019
Head Quarter Transmission line work Domestic Creation of LILO of both circuits of 220kV Sector 65-Pali D/C line on M/C & D/C towers with 0.4sq inch AL-59 conductor at 400kV substation Kadarpur along with augmentation of balance 0.4 sq inch ACSR conductor of 220kV Kadarpur–Sector 65 ..... NIT-1075 Dated 02.09.2019



Dec 11, 2019
Field Office Civil Mtc. Revenue Providing periodical services such as Painting, OBD and Heritage texture paint to HPTI Building at Madanpur, Sector-26, Panchkula NIT-09-CCD-190H-Vol.-VIII--2019-20 Dated 29.11.2019



Dec 11, 2019
Field Office Civil Mtc. Revenue Providing 25 mm thick premix carpet to internal roads at HPTI, Sector-26, Panchkula. NIT-08-CCD-190H-Vol.-VIII--2019-20 Dated 18.11.2019



Dec 10, 2019
Field Office Civil Works .... Construction of 01 No. Set DT-2/DT-3, CT-4 & CT-6 at 66KV S/Stn. DLF Q-Block, Gurugram NIT-03-CWG-2019-20 Dated 06.11.2019



Dec 12, 2019 Dec 17, 2019
Field Office Electrical Work .... providing 2 Nos 12.5/16 MVA T/F at 66 KV S/Stn. Malikpur NIT-21-12.5-16MVA-TF Malikpur-2019-20 Dated 28.11.2019



Dec 18, 2019
Field Office Civil Works .... White-Washing of NRB & Repair.mtc. & painting of rusted fencing at 66 Kv s/stn Kalsana,Dukari,Majri,Naneola and Nalvi NIT-20-AMB-Civil Works-2019-20 Dated 28.11.2019



Dec 17, 2019
Field Office Civil Works .... providing submersible tubewell with 400 Feet bore against failed bore at 66 KV S/Stn HVPNL Saha NIT-19-AMB-Submersible Bore-2019-20 Dated 27.11.2019



Dec 14, 2019 Dec 16, 2019
Field Office Civil Works .... For providing of 132 KV 2nd Ckt to 132 KV Bhusthla at Bay B-2 along with allied Equipments at 132 KV Ismilabad. NIT-12-CWK-11-2019-20 Dated 27.11.2019



Dec 5, 2019 Dec 6, 2019
Field Office Civil Works .... Repair, mtc & Construction of damaged Boundary wall due to flood at Power Colony Dhulkot complex (as per sketch No.HCD/SK-197) NIT-16-AMB-Civil Dated 05.11.2019



Nov 27, 2019 Dec 11, 2019
Field Office Electrical Work REC Replacement of 02 No. 132 kV Ckt Breakers controlling 132/11 kV,10/16 MVA T-3 T/F and 132 kV Incomer Breaker of 100 MVA,220/132 kV T-9 T/F at 220 kV Pehowa NIT- 28-EG-70-2019-20 dated 26.11.2019



Dec 4, 2019
Field Office Dept. SSTN .... Work of replacement of MK’s and 132kV L&E switch at 220kV Samalkha, 132kV SF-6 breaker at 132kV Chandoli and painting of electrical equipment’s at 132kV Harsana Kalan NIT-33-TS-Divn.-PNP-2019-20 Dated 25.10.2019



Dec 10, 2019
Field Office Civil Works .... Extension of switch house building at 220 KV S/Stn. Pali. NIT-07-CWFG-25-Vol.-III-2019-20 Dated 22.11.2019



Dec 12, 2019 Dec 12, 2019
Field Office Civil Works .... Extension of switch House building at 66 Kv S/stn. Partap Steel. NIT-06-CWFG-25-Vol.-III-2019-20 Dated 22.11.2019



Dec 12, 2019 Dec 12, 2019
Field Office Civil Works Capital Earth filling & supply and spreading of Gravel in existing yard at 220 KV S/Stn. Pali. NIT-03-CWFG-25-Vol-III-2019-20 Dated.31.10.2019



Dec 6, 2019 Dec 6, 2019
Field Office Civil Works Capital Supply and spreading of gravel in A-5, line and bus coupler bay at 66KV S/Stn. Idgah NIT-02-CWFG-25-Vol-III-2019-20 Dated.31.10.2019



Dec 6, 2019 Dec 6, 2019
Field Office Capital Work .... Augmentation of 66 KV S/Stn Jathlana from (2x12.5/16MVA) to (1x12.5/16MVA + 1x25/31.5 MVA) 66/11KV Transformers NIT-17-TS-YNR-2019-20 Dated 21.11.2019



Nov 28, 2019
Field Office Capital Work .... Providing 1 no. foundation of NCT structure and 5 no. earth bores at 66 kV S/Stn. Sec-15, HUDA Jagadhri. NIT-15-TS-YNR-2019-20 Dated 19.11.2019



Nov 25, 2019 Nov 26, 2019
Field Office Civil Works .... For augmentation of 220 KV S/Stn Unispur by providing additional 100 MVA 220/132 KV T/F (Civil Works)(Surface dressing supply and spreading of crushed Bajri) NIT-11-CWK-11-2019-20 Dated 18.11.2019



Nov 28, 2019 Nov 29, 2019
Field Office Dept. SSTN .... Construction of additional ODSG foundation, ODCT, U/C fencing, PC supply & spreading of bajri at 132 KV Sub-Station Ding NIT-21-TS-FBD-2018-19 Dated 21.01.2019



Dec 2, 2019
Field Office Capital Work REC Construction of 04 Nos. 132 KV SF-6 breaker (ABB Make) at 220 KV S/Stn. HVPNL, Nissing NIT-64-TSKNL-2019-20 Dated 15.11.2019



Nov 22, 2019
Field Office Electrical Work REC Augmentation of existing 20/25 MVA, 132/33KV T/F to 40/50 MVA 132/33KV at 132 KV S/Stn., HVPNL, Jundla NIT-63-TSKNL-2019-20 Dated 15.11.2019



Nov 22, 2019
Field Office Electrical Work .... Raising the height of 132kV S/C Pehowa-Malikpur line in the affected portion at tower location no. 20&21 to achieve the proper ground clearance as the same has been affected/decreased due to up-gradation of Ambala-Hisar road to Dhanirampura road (ROA NIT-26-EG-70-2019-20 Dated 14.11.2019



Nov 25, 2019
Field Office Civil Works .... For Creation of 1 no. 132KV Bay to accommodate one circuit of 132KV Kaithal-Pai S/C Line on D/C Tower 0.4Sq inch ACSR conductor at 132KV S/Stn. Pai.( Surface dressing, supply and spreading of gravel) NIT-10-CWK-11-2019-20 Dated 14.11.2019



Nov 25, 2019 Nov 26, 2019
Field Office Department Work Revenue Dismantlement of 2 Nos. 220kV Tata design tower of T/L No. 156 DA+0 & T/L No. 162 DA+0 for 220kV Fatehabad – Rania NIT-18-XEN-TS-SRS-2019-20 Dated 12.09.2019



Nov 15, 2019
Field Office Service Works .... Providing General Routine Maintenance of Residential/ Non-Residential Buildings and Rest houses in Power House Colony. Providing Sanitation Services, Arboriculture Services & Security Services in Power House Colony at Dhulkote complex Ambala. (For th NIT-18-Dkt.-Complex-2019-20 Dated 13.11.2019



Nov 26, 2019
Head Quarter Transmission line work Domestic Creation of 220kV D/C line on M/C towers from 400kV S/Stn. Prithla to 220kV S/Stn. Sector - 78, Faridabad NIT-1081 Dated 05.09.2019



Nov 21, 2019
Field Office Department Work Revenue Providing/Making Y shape jumpers on all Dead-End Towers on 220 KV D/C Sagwan-Isharwal lines to avoid frequent breakdowns during FY-2019-20 NIT-22-TS-BHW-2019-20 Dated 31.10.2019



Nov 13, 2019 Nov 15, 2019
Field Office Electrical Work HR-TD-TRM Replacement of 132 KV MK at 132 KV S/Stn. HVPNL, Karnal NIT-61-TSKNL-2019-20 Dated 08.11.2019



Nov 18, 2019
Field Office Electrical Work REC Replacement of Old and Obsolete 132 KV SF-6 breaker installed at 132 KV, 16/20 MVA T/F T-2 at 132 KV S/Stn. HVPNL, Newal NIT-62-TSKNL-2019-20 Dated 08.11.2019



Nov 18, 2019
Field Office Dept. SSTN .... Augmentation of existing 12.5/16 MVA, 66/11 KV T/F T-1 to 25/31.5 MVA 66/11 KV T/F at 66 KV S/Stn. HVPNL, Chandhut. NIT-13-XEN-TS-PWL-2018-19 Dated 09.09.2019



Nov 19, 2019 Nov 19, 2019
Field Office Dept. SSTN .... Augmentation of existing 12.5/16 MVA, 66/11 KV T/F T-1 by 25/31.5 MVA 66/11 KV T/F at 66 KV S/Stn. HVPNL, Allwalpur NIT-12-XEN-TS-PWL-2018-19 Dated 09.09.2019



Nov 19, 2019 Nov 19, 2019
Head Quarter Transmission line work Domestic Revival of Nuh-Nagina Section of 66 kV Sohna-Nagina S/C line having 0.15 sq inch ACSR conductor lying under outage on account of theft of conductor NIT-1077 Dated 02.09.2019



Nov 19, 2019
Field Office Civil Works Civil Mtc. 74.2 White Washing & Mtc.of NRB at 66kV Sub Station Nalvi,Babyal,Shahabad(M),Ugala& Maintenance & renovation of office of XEN UHBVNL at NRB 66 Kv S/Stn Shahabad(M) NIT-17-AMB-Civil Works-2019-20 Dated 19.09.2019



Nov 25, 2019
Field Office Civil Works Civil Mtc. 74.2 Maintenance of M and P Office at 220-132KV Sub Station, HVPNL, Power House Colony, Karnal. NIT-60-TS-KNL-2019-20 Dated 05.11.2019



Nov 14, 2019
Field Office Civil Mtc. .... providing submersible tubewell with 400 Feet bore against failed bore at 66 KV S/Stn HVPNL Saha Mtc. & White-Washing of NRB at 66 Kv s/stn Kalsana Repair.mtc. & painting of rusted fencing at 66kv Sub Station Kalsana Maintnance & white washing ..... NIT-14-AMB-Civil Works-2019-20 Dated 28.08.2019



Nov 20, 2019
Field Office Capital Work .... Repair,maintenance & white washing of residential Buildings at H.No.CAT-(A),CAT-B(OLD),CAT-B(NEW),CAT-(C)& CAT-(E)at Dhulkot Complex. NIT-12-AMB-Civil Works-2019-20 Dated 26.08.2019



Sep 26, 2019
Field Office Equipment REC 132/11KV, 16/20MVA Power Transformer NIT-1083 Dated 11.09.2019



Nov 19, 2019
Field Office Civil Mtc. Revenue Repair & maintenance of 30 No. Residential quarters at 132 KV S/Stn HVPNL Colony Bhiwani during the year 2019-20 on Through Rate (Tender ID:- 2019_HBC_106410_1). NIT-21-TS-BHW-2019-20 Dated 30.10.2019



Nov 13, 2019 Nov 15, 2019
Field Office Department Work Revenue Providing/Making Y shape jumpers on all Dead-End Towers on 220 KV D/C Sagwan-Isharwal lines to avoid frequent breakdowns during FY-2019-20 (Tender ID:- 2019_HBC_105335_1). NIT-20-TS-BHW-2019-20 Dated 19.09.2019



Oct 9, 2019 Oct 11, 2019
Field Office Civil Mtc. .... Repair & maintenance of 30 No. Residential quarters at 132 KV S/Stn HVPNL Colony Bhiwani during the year 2019-20 on Through Rate (Tender ID:- 2019_HBC_103917_1). NIT-18-TS-BHW-2019-20 Dated 12.09.2019



Sep 24, 2019 Sep 26, 2019
Field Office Civil Works .... Providing 1no. 16/20MVA 132/11 KV T/F (Hot) , fire wall and allied Civil Works at 132 KV S/Stn. Murthal NIT-09-CWS-2019-20 Dated 29.10.2019



Nov 19, 2019 Nov 21, 2019
Field Office Civil Works .... Providing 1no. 16/20MVA 132/11 KV T/F (Hot) , fire wall and allied Civil Works at 220 KV S/Stn. Fazilpur NIT-08-CWS-2019-20 Dated 29.10.2019



Nov 19, 2019 Nov 21, 2019
Field Office Civil Works .... Construction of 33Kv outgoing bay for village Ujjana at 132 kV S/Stn. Ghari NIT-06-CWD-2-Vol-X-HVPN-2019-20 Dated 30.08.2019



Sep 9, 2019 Oct 10, 2019
Field Office Electrical Work .... Dismentalment of HOT T/F & Errection of 16/20 MVA, 132/11 KV T/F at 132 KV S/Stn. HVPNL, Karnal NIT-59-TS-KNL-2019-20 Dated 30.10.2019



Nov 7, 2019
Field Office Civil Works .... Repairing of 16 Nos. Stub of 132 KV S/C Karnal-Ramba Line NIT-58-TS-KNL-2019-20 Dated 30.10.2019



Nov 8, 2019
Field Office Civil Mtc. Revenue Providing 25 mm thick premix carpet to internal roads at HPTI, Sector-26, Panchkula. NIT-04-CCD-286-Vol.-IX-2019-20 Dated 19.09.2019



Nov 15, 2019
Field Office Civil Mtc. Revenue Providing Annual Maintenance of Residential & Non-Residential Buildings rest houses including, Water Supply, Sewerage System, Storm Water, Drainage System, Road & Path, at 66KV S/Stn. Power Colony, Industrial Area, Phase-II, Panchkula and Guest House NIT-05-CCD-286-Vol.-IX-2019-20 Dated 19.09.2019



Nov 13, 2019
Head Quarter Equipment .... 66 kV CAPACITIVE VOLTAGE TRANSFORMER NIT-1068 Dated 29.07.2019



Nov 6, 2019
Field Office Dept. SSTN .... Supply & Spreading of Gravel in 220 KV and 33KV Bay AT 220 KV S/Stn Nuna Majra. XEN Civil Works Rohtak NIT-04-CWR-2019-20 Dated 29.10.2019



Nov 14, 2019
Head Quarter Transmission line work Domestic Construction of 220 & 66 kV transmission lines in Yamunanagar & Ambala area NIT-1174 Dated 27.08.2019



Nov 7, 2019
Head Quarter Transmission line work Domestic Construction of 132kV lines in Rewari & Mahendargarh area NIT-1082 Dated 05.09.2019



Nov 6, 2019
Field Office Civil Works .... Repair of roof and parapet wall at 132 Kv S/Stn. Narwana old. NIT-07-CWD-2-Vol-X-HVPN-2019-20 Dated 03.09.2019



Oct 29, 2019 Oct 30, 2019
Head Quarter Purchase Material .... Design, Manufacture, Supply , Testing & Commissioning of 01 No. 132/11 kV, 16/20 MVA Mobile Sub-Station on Turnkey Basis NIT-1060 Dated 01.07.2019



Nov 4, 2019
Head Quarter Transmission line work Domestic Construction of 66 kV composite transmission lines in Faridabad and Gurugram area NIT-1070 Dated 05.08.2019



Oct 9, 2019 Oct 11, 2019
Field Office Outsource Services Civil Mtc. 74.2 Providing outsourcing services regarding general maintenance and up keep of Residential and Non-Residential Buildings rest houses including, Water Supply, Sewerage System, Storm Water, Drainage System, Road, Path at 220-132 KV SStn. PH Cly, knl NIT-58-TS-KNL-2019-20 Dated 20.09.2019



Sep 27, 2019
Field Office Civil Works .... Renovation of E-Type quarters for office of AE mtc. Gang, HVPNL Karnal at 220 KV S/Stn. HVPNL, Karnal NIT-57-TS-KNL-2019-20 Dated 20.09.2019



Sep 27, 2019
Field Office Civil Works .... Painting the allied equipments at 132 KV S/Stn. HVPNL, Madhuban NIT-56-TS-KNL-2019-20 Dated 20.09.2019



Sep 27, 2019
Field Office Civil Works REC Supply & Spreading of Gravel in 220 KV and 33KV Bay AT 220 KV S/Stn Nuna Majra NIT-03-CWR-2019-20 Dated 20.09.2019



Oct 11, 2019 Oct 14, 2019
Field Office Department Work Revenue Augmentation of 220kV S/Stn. HVPNL, Sirsa by providing 40/50MVA, 132/33kV T/F in place of 20/25MVA, 132/33kV T/F NIT-17-XEN-TS-SRS-2019-20 Dated 06.09.2019



Sep 12, 2019
Field Office Department Work Revenue Providing 4 Nos. Bore Earthing to 132 KV & 11 KV NCTs on10/16 MVA, 132/11 KV T/F T-1 installed at 132 KV S/Stn, HVPNL, Behal (Haryana) during the year 2019-20 on Through NIT-19-TS-BHW-2019-20 Dated 17.09.2019



Oct 9, 2019 Oct 11, 2019
Field Office Civil Works .... Wire mesh fencing boundary at 132 KV S/Stn., HVPNL, Madhuban. NIT-50-TS-KNL-2019-20 Dated 09.09.2019



Sep 26, 2019
Field Office Department Work .... Providing 25/31.5 MVA 66/11KV Hot T/F at 66KV S/Stn A-2 Faridabad NIT-17-TS-FBD-2018-19 Dated 06.12.2018



Sep 30, 2019
Field Office Civil Works .... Construction of 01 No. Set DT- 2/DT-3, CT-4 & CT-6 at 66KV S/Stn. DLF QBlock, Gurugram NIT-01-CWG-2019-20 Dated 16.09.2019



Oct 7, 2019 Oct 11, 2019
Field Office Civil Works .... Construction of 01 No. T/F Plinth ODSG, ODCT at 66KV Sub-Station, Sector-34/35, Gurugram NIT-02-CWG-2019-20 Dated 17.09.2019



Oct 7, 2019 Oct 11, 2019
Head Quarter Construction Work .... construction of 132kV S/Stn. Kamalpur (Rewari) against e-Tender Enquiry No. EPC-D-267 NIT-1072 Dated 13.08.2019



Sep 27, 2019
Field Office Dept. SSTN .... Providing additional 100 MVA, 220/33kV T/F T-3 at 220kV S/Stn. Rangala Rajpur. NIT-14-TS-PWL-2019-20 Dated 16.09.2019



Oct 16, 2019 Oct 16, 2019
Field Office Capital Work .... Replacement of old & obsolete / defective 132 KV SF-6 breaker CGL make of Nissing - Jundla line at 220 KV S/Stn., HVPNL, Nissing. NIT-55-TS-KNL-2019-20 Dated 13.09.2019



Sep 24, 2019
Field Office Capital Work .... Replacement of old & obsolete of 132 KV air pressure operated SF-6 breaker installed at 132/11 KV 16/20 MVA T/F (T-1,T-2,T-3) at 132 KV S/Stn. HVPN, Indri NIT-54-TS-KNL-2019-20 Dated 13.09.2019



Sep 24, 2019
Field Office Dept. SSTN Augmentation .... Augmentation of existing 12.5/16 MVA, 66/11 KV T/F T-1 to 25/31.5 MVA 66/11 KV T/F at 66 KV S/Stn. HVPNL, Punhana. NIT-11-XEN-TS-PWL-2018-19 Dated 15.07.2019



Sep 27, 2019 Sep 27, 2019
Field Office Dept. SSTN .... Creation of 1 no. 33kV Bay at 132kV S/Stn Kariwala to accommodate 33kV S/Stn. Kariwala ( Approved code 3B 2346*). NIT-01-XEN-TS-RTK-2019-20 Dated 30.08.2019



Sep 19, 2019
Field Office Dept. SSTN .... Augmentation of 20/25 MVA, 132/33 KV T/F by 40/50 MVA, 132/33 KV Power T/F at 132 KV S/Stn.HVPN Jhajjar NIT-04-XEN-TS-RTK-2019-20 Dated 30.08.2019



Sep 19, 2019
Head Quarter Dept. SSTN .... CONSTRUCTION OF 220 KV GIS S/STN SEC-15II GURUGRAM (UPGRADATION FROM 66 KV LEVEL) AND CONSTRUCTION OF 2 NO. 220 KV GIS LINE BAYS AT 220 KV GIS S/STN SEC-65 GURUGRAM ON TURNKEY BASIS NIT-1069 Dated 05.08.2019



Sep 27, 2019
Field Office Capital Work .... Providing additional 33 KV Garhi Bharal bay at 220 KV S/Stn., HVPNL, Bastara NIT-53-TS-KNL-2019-20 Dated 11.09.2019



Sep 19, 2019
Field Office Capital Work .... Providing 132 KV S/C bay for 2nd CKT of existing 132 KV Unispur – Kirmich line on D/C tower at 220 KV S/Stn., HVPN Unispur. NIT-52-TS-KNL-2019-20 Dated 11.09.2019



Sep 19, 2019
Field Office Civil Works REC Supply & Spreading of Gravel in 220 KV and 33KV Bay AT 220 KV S/Stn Nuna Majra NIT-02-CWR-2019-20 Dated 26.08.2019



Sep 17, 2019 Sep 19, 2019
Field Office Civil Works .... Structure Painting of 132 KV and 33 KV Type at 220 KV S/Stn. HVPNL, Nissing NIT-51-TS-KNL-2019-20 Dated 09.09.2019



Sep 20, 2019
Field Office Civil Works .... Renovation of E-Type quarters for office of AE mtc. Gang, HVPNL Karnal at 220 KV S/Stn. HVPNL, Karnal NIT-49-TS-KNL-2019-20 Dated 09.09.2019



Sep 20, 2019
Field Office Transmission line work REC Termination of existing 66 KV S/C Palwal-Hodal line at new 66 KV S/Stn Banchari with 0.15 sq'' AAAC conductor by providing 66 KV S/C tower NIT-10-XEN-TS-PWL-2018-19 Dated 01.07.2019



Sep 17, 2019 Sep 17, 2019
Field Office Dept. SSTN .... Plugging of oil leakage from 132/33 kV 20-25 MVA T/F T-2 at 132 kV S/Stn., HVPNL, Sector-3, Rohtak NIT-07-XEN-TS-RTK-2019-20 Dated 09.09.2019



Sep 24, 2019 Sep 25, 2019
Field Office New Work .... Creation of one No. 33 KV line bay at 132 KV S/Stn, HVPNL, Loharu to accomodate the feeding of 33 KV S/Stn DHBVN Damkora (Tender ID:- 2019_HBC_102240_1). NIT-15-TS-BHW-2019-20 Dated 06.09.2019



Sep 11, 2019 Sep 12, 2019
Field Office Electrical Work .... Providing addl 100 MVA 220/66 KV T/F at 220 KV S/Station Shahabad (M). NIT-15 -100-MVA-TF-SBD-2019-20 Dated 13.09.2019



Sep 13, 2019
Field Office Painting Work .... 1). Repainting of 100MVA 220/132KV T-2, 132/33KV 40/50MVA T-8 T/F at 220KV S/Stn Pehowa 2). Repainting of 100MVA 220/132KV T-1 and T-9 T/F at 220KV S/Stn. Pehowa 3). Repainting of Power Transformers at 220KV S/Stn. Pehowa NIT-24-EG-70-2019-20 Dated 06.09.2019



Sep 12, 2019
Field Office Civil Works REC Augmentation of 132 KV S/Stn Assaudha from 1x20/25MVA 132/33KV T/F to (1x20+1x40/50) MVA 132/33 KV T/F Plinth, Addl.ODSG Foundation, ODCT, E/Filling, Road at 132KV S/Stn Assaudha. NIT-01-CWR-2019-20 Dated 26.07.2019



Sep 10, 2019
Field Office Civil Works .... Repairing of 16 Nos. Stub of 132 KV S/C Karnal-Ramba Line NIT-48-TS-KNL-2019-20 Dated 06.09.2019



Sep 16, 2019 Sep 16, 2019
Field Office Civil Works .... Painting of 132 KV S/C Karnal -Madhuban Transmission Line Towers. NIT-47-TS-KNL-2019-20 Dated 05.09.2019



Sep 16, 2019 Sep 16, 2019
Field Office Civil Works NABARD 132 kv Double bus bar arrangement along with bus coupler bay b-5 at 132kv substation HVPN Ismalibad. (site surfacing, dressing supply and spreading of crushed bajri (Civil Works) NIT-06-CWK-11-2019-20 Dated 16.08.2019



Sep 13, 2019 Sep 13, 2019
Head Quarter Transmission line work Domestic Creation of LILO of both circuits of 220kV Sector 65-Pali D/C line on M/C & D/C towers with 0.4sq inch AL-59 conductor at 400kV substation Kadarpur along with augmentation of balance 0.4 sq inch ACSR conductor of 220kV Kadarpur–Sector 65 ..... NIT-1076 Dated 02.09.2019



Oct 17, 2019 Oct 21, 2019
Field Office Civil Works .... Renovation of two no. E Type quarter for temporary Rest Sub-ordinate Rest House Karnal at 220/132KV S/Stn. Power house colony Karnal. NIT-46-TS-KNL-2019-20 Dated 05.09.2019



Sep 12, 2019 Sep 12, 2019
Field Office Civil Works .... Construction of 33Kv bay for village Barnawali at 132 kV S/Stn. Bhattu-Sotter NIT-05-CWD-2-Vol-X-HVPN-2019-20 Dated 29.08.2019



Sep 11, 2019 Sep 12, 2019
Field Office O&M .... Scrapping & painting of rusted steel structure installed at 66 kv S/Stn. HVPNL, Ladwa NIT-12-XEN-TS-YNR-2019-20 Dated 05.09.2019



Sep 11, 2019 Sep 12, 2019
Field Office New Work .... Providing double bus bar arrangement at 132 KV S/stn. HVPNL, Badhra. NIT-14-TS-BHW-2019-20 Dated 02.09.2019



Sep 9, 2019 Sep 10, 2019
Field Office Civil Works .... For Strengthing of 1no. 100MVA 220/132KV T/F plinth to 160MVA T/F plinth ODSG foundation and allied equipments at 220KV S/Stn. Bastara.(Civil Works ) .(Surface dressing ,PCC,supply and spreading of crushed Bajri) E NIT-09-CWK-11-2019-20 Dated 04.09.2019



Sep 10, 2019 Sep 11, 2019
Field Office Department Work Revenue Creation of one no. 132kV line bay at 132kV S/Stn. Dhudianwali to accommodate stringing of 2nd Circuit of 132kV Nuhiyanwali - Dhudianwali line approval Code 1B2677*. NIT-12-XEN-TS-SRS-2019-20 Dated 03.09.2019



Sep 9, 2019
Field Office Department Work Revenue Creation of one no. 132kV line bay to accommodate 132kV Nuhiyanwali - Assakhera line at 400kV S/Stn. Nuhiyanwali. NIT-11-XEN-TS-SRS-2019-20 Dated 03.09.2019



Sep 9, 2019
Field Office Department Work Revenue Creation of 132kV double bus bar arrangement, creation of 132kV line bay to accommodate 132kV Nuhiyanwali - Assakhera line and dismantlement equipments on existing 132kV Assakhera- Dabwali line Bay at 132kV S/Stn. Assakhera. NIT-07-XEN-TS-SRS-2019-20 Dated 26.08.2019



Sep 2, 2019
Field Office Department Work Revenue Creation of 1 No.33kV line Bay at 220kV S/Stn. HVPNL, Chormar to accommodate 33kV line Desu Jhoda, Approval Code 3B2855*. NIT-06-XEN-TS-SRS-2019-20 Dated 26.08.2019



Sep 4, 2019
Field Office Department Work Revenue Creation of 1 No. 33kV line Bay at 132kV S/Stn. HVPNL, Sikenderpur to accommodate 33kV S/Stn. Sangar Sristha, Approval Code 3B2669* NIT-16-XEN-TS-SRS-2019-20 Dated 03.09.2019



Sep 9, 2019
Field Office Department Work Revenue Creation of 1 No.33kV line Bay at 132kV S/Stn. HVPNL, Kariwala to accommodate 33kV line Moju Ki Dhani, Approval Code 3B3020*. NIT-15-XEN-TS-SRS-2019-20 Dated 03.09.2019



Sep 9, 2019
Field Office Department Work Revenue Creation of 1 No.33kV line Bay at 132kV S/Stn. HVPNL, Kariwala to accommodate 33kV line Moju Ki Dhani, Approval Code 3B3020*. NIT-14-XEN-TS-SRS-2019-20 Dated 03.09.2019



Sep 9, 2019
Head Quarter Equipment .... Digital insulation resistance test kit (suitable for use upto 220 kV s/stns NIT-1078 Dated 02.09.2019



Oct 4, 2019
Head Quarter Equipment .... 132/33KV, 40/50 MVA Power Transformer NIT-1064 Dated 08.07.2019



Sep 17, 2019
Field Office Dept. SSTN .... Augmentation of 12.5 MVA, 132/33 KV T/F by 40/50 MVA, 132/33 KV Power T/F at 132 KV S/Stn. Matanhail NIT-05-XEN-TS-RTK-2019-20 Dated 30.08.2019



Sep 6, 2019
Field Office Dept. SSTN .... Repair and maintenance of Non residential building at 220 kv Sub Station HVPN Nuna -Majra (B.garh NIT-03-XEN-TS-RTK-2019-20 Dated 30.08.2019



Sep 6, 2019
Field Office Dept. SSTN .... Providing additional 20/25 MVA, 132/33 KV T/F with 132 & 33 KV Bays at 132 KV S/Stn.Bhanderi NIT-02-XEN-TS-RTK-2019-20 Dated 30.08.2019



Sep 6, 2019
Head Quarter Equipment .... Procurement of various 400 kV Lightening Arrestor NIT-1048 Dated 19.06.2019



Sep 13, 2019
Field Office Dept. SSTN .... Providing additional 12.5/16 MVA 66/11kV T/F T-2 at 66kV S/Stn. Rundhi NIT-08-XEN-TS-PWL-2018-19 Dated 08.03.2019



Sep 6, 2019 Sep 6, 2019
Field Office Civil Mtc. Revenue Providing Annual Maintenance of Residential & Non-Residential Buildings rest houses including, Water Supply, Sewerage System, Storm Water, Drainage System, Road & Path, at 66KV S/Stn. Power Colony, Industrial Area, Phase-II, Panchkula and Guest House NIT-03-CCD-286-Vol.-IX-2019-20 Dated 29.08.2019



Sep 9, 2019
Field Office Department Work Revenue Creation of 1 no. 33kV Bay at 132kV S/Stn Kariwala to accommodate 33kV S/Stn. Kariwala ( Approved code 3B 2346*). NIT-10-XEN-TS-SRS-2019-20 Dated 29.08.2019



Sep 5, 2019
Field Office Civil Works .... Repair & Mtc. of Open Drainage system with covered PVC Pipe and interlocking Paver block Road in Residential Colony at 66KV S/Stn. Pipli & Extension of toe wall to avoid lagging up of water in yard and control room building at 132KV S/Stn. Pipli NIT-22-EG-70-2019-20 Dated 29.08.2019



Sep 5, 2019 Sep 6, 2019
Field Office Civil Works .... Construction of additional ODSG foundations, ODCT, 2Nos. anti filre wall & 1 No. 132/33 kV T/F plinth for 2 Nos. outgoing bay to Koel & Barala at 132 kV Sub-Stn. Dhanouri NIT-04-CWD-2-Vol-X-HVPN-2019-20 Dated 22.08.2019



Sep 3, 2019 Sep 4, 2019
Field Office Department Work Revenue Plugging the oil leakage on 2x100 MVA, 220/132 KV T/F T-1 and T-2 installed at 220 KV S/Stn, HVPNL, Sirsa (Haryana). NIT-05-XEN-TS-SRS-2019-20 Dated 30.07.2019



Sep 2, 2019
Field Office Civil Works .... Creation of 1 no. 33KV bay at 132kv S/Stn. Pundri to accommodate new 33kv S/Stn. Jamba along with bus coupler bay {Site surfacing, supply and spreading of gravel (Civil Works)} NIT-08-CWK-11-2019-20 Dated 28.08.2019



Sep 9, 2019 Sep 10, 2019
Field Office Civil Works NABARD Creation of two no. at 132kv bays at 132kv S/Stn. Bhadson to accommodate 132kv S/C line of 0.4Sq" ACSR ON 132KV D/C tower emanating from 220kv S/Stn. Unispur and feeding 132kv S/Stn. Indri through 132kv S/C Bhadson-Indri line respectively . {Site sur NIT-07-CWK-11-2019-20 Dated 28.08.2019



Sep 9, 2019 Sep 10, 2019
Field Office New Work .... Creation of double bus arrangement along with bus coupler at 132 KV S/stn. HVPNL, Miran FY-2019-20 (Tender ID:- 2019_HBC_97538_1). NIT-13-TS-BHW-2019-20 Dated 24.08.2019



Sep 4, 2019 Sep 5, 2019
Field Office New Work .... Creation of one no. 33 KV line bay at 132 KV S/Stn HVPNL Behal to accommodate the feeding of 33 KV S/Stn. Surpur Kalan FY-2019-20 (Tender ID:- 2019_HBC_97508_1). NIT-11-TS-BHW-2019-20 Dated 24.08.2019



Sep 3, 2019 Sep 4, 2019
Field Office New Work .... Creation of one no. 33 KV line bay at 132 KV S/Stn HVPNL Behal to accommodate the feeding of 33 KV S/Stn. Chehar Kalan. NIT-12-TS-BHW-2019-20 Dated 24.08.2019



Sep 3, 2019 Sep 4, 2019
Field Office Department Work Equity Replacement of defective 20/25 MVA 132/33 KV T/F with same capacity at 220 KV S/Stn, HVPNL, Isherwal FY-2019-20 (Tender ID:- 2019_HBC_97383_1). NIT-10-TS-BHW-2019-20 Dated 24.08.2019



Aug 29, 2019 Aug 29, 2019
Field Office Electrical Work .... Providing 2 Nos 12.5/16 MVA T/F at 220KV S/Station Rajokheri NIT-13-12.5-16 MVA TF- Rajokheri -2019-20 Dated 27.08.2019



Sep 5, 2019
Field Office Department Work Revenue Augmentation of 132KV Sub-Station HVPNL, Odhan by providing 40/50 MVA, 132/33kV in place of 20/25MVA, 132/33kV T/F. NIT-09-XEN-TS-SRS-2019-20 Dated 27.08.2019



Sep 5, 2019
Field Office Department Work Revenue Creation of 132kV double bus bar arrangement and 1 No. 132kV line bay to accommodate 132kV Mehna Khera-Ram Nagaria line at 132kV S/Stn. Ram Nagaria. NIT-08-XEN-TS-SRS-2019-20 Dated 27.08.2019



Sep 5, 2019
Field Office Civil Works .... Repair and Mtc.of Civil works at 66 kv S/Stn.Barara,Adhoya,Saha and Babyal NIT-05-AMB-Civil Works-2019-20 Dated 09.07.2019



Sep 2, 2019
Field Office Civil Works .... Painting the allied equipment at 132 KV S/Stn. HVPNL, Madhuban. NIT-45-TS-KNL-2019-20 Dated 26.08.2019



Sep 4, 2019
Field Office Deposit Work Deposit Work Replacement/raising the height of towers crossing arrangement of 66 KV S/C Jorian to Gobindpuri transmission line T/L No. 123 & 124 near Jagadhari workshop railway station at KM 217/20-21 NIT-03-TSYNR-2018-19 Dated 26.08.2019 (Revised)



Sep 3, 2019
Field Office Mtc. E&E Revenue Refilling of fire fighting equipments (DCP & CO2 type) under TS division, HVPNL Panipat NIT-23-TS-Divn.-PNP-2017-18 Dated 23.08.2019



Sep 4, 2019 Sep 4, 2019
Field Office Capital Work .... Providing addl 100 MVA 220/66 KV T/F at 220 KV S/Station Shahabad (M). NIT-11-100 MVA-TF-SBD-2019-20 Dated 22.08.2019



Sep 2, 2019
Field Office Civil Works Capital Construction of 4No. Isolator & 6No. LA foundation at 66KV S/Stn. Idgah Faridabad NIT-01-CWFG-25-Vol.-III-2019-20 Dated 30.07.2019



Sep 2, 2019 Sep 2, 2019
Field Office Civil Mtc. REC Outsourcing of General Maintenance of Residential and Non-Residential Buildings, Arboriculture/Horticulture including cleaning roads & paths, Security arrangement in colonies, offices and Rest Houses located at 132 KV HVPNL, Colony Bhiwani FY-2019-20 NIT-09-TS-BHW-2019-20 Dated 22.08.2019



Aug 28, 2019 Aug 29, 2019
Field Office Civil Works .... Const. of Addl. ODSG, and allied Civil Works for creation 1 no. 33 KV line bay for 33 KV Bohli at 132 KV S/Stn. HSIIDC, Panipat NIT-05-CWS-2019-20 Dated 19.08.2019



Aug 28, 2019 Aug 30, 2019
Field Office Civil Works .... Construction of 2 Nos. 33 KV Bay for village Budhesli and Bhera at 220 kV Sub-Station Isherwal NIT-03-CWD-2-Vol-X-HVPN-2019-20 Dated 21.08.2019



Aug 28, 2019 Aug 29, 2019
Field Office Civil Works .... Maintenance of Residential Quarter at Power House Colony at 132 KV S/Stn. HVPNL, Gharaunda NIT-44-TS-KNL-2019-20 Dated 20.08.2019



Aug 28, 2019
Field Office Civil Works .... Construction of 33 KV PT's Bus sectionalizor Isolator foundation & Trench at 132 kV Sub-Stn. Kairu NIT-02-CWD-2-Vol-X-HVPN-2019-20 Dated 20.08.2019



Aug 27, 2019 Aug 28, 2019
Field Office O&M .... On site Testing & Calibration of 0.2S Class SEM in various s/stns under TS Division, Yamuna Nagar from NABL LAB (129 No. Meter) NIT-08-TSYNR-2019-20 Dated 09.08.2019



Aug 26, 2019 Aug 26, 2019
Head Quarter Equipment .... 132/11KV, 16/20MVA Power Transformer NIT-1056 Dated 25.06.2019



Sep 3, 2019
Field Office Dept. SSTN REC Providing alternate source of supply at 132kv Chhajpur S/Stn. by making alternate LILO of one ckt of 132kV D/C Chhajpur – Sec 29 S/C line on D/Ckt towers NIT-19-TS-Divn.-PNP-2017-18 Dated 16.08.2019



Sep 26, 2019
Head Quarter Equipment .... Procurement of 132 kV Lightening Arrestor NIT-1049 Dated 24.06.2019



Aug 28, 2019
Head Quarter Equipment .... Digital Insulation Resistance Test Kit ( Suitable for use upto 400KV S/Stns ) NIT-1051 Dated 24.06.2019



Aug 28, 2019 Aug 28, 2019
Field Office Civil Works .... Const. of Addl. ODSG, and allied Civil Works for creation 1 no. 33 KV line bay for Dikadla at 132 KV S/Stn. Beholi NIT-04-CWS-2019-20 Dated 16.08.2019



Aug 23, 2019 Aug 27, 2019
Head Quarter Equipment .... PROCUREMENT OF 66KV ISOLATOR AND LINE & EARTH. NIT-1043 Dated 11.06.2019



Aug 23, 2019
Head Quarter Equipment .... 415V,300A,AC Distribution Board NIT-1039 Dated 07.06.2019



Aug 26, 2019
Head Quarter Equipment .... Supply and Erection of 220/132 kV outdoor /Indoor termination kits for completion of balance /left out work at 220 KV S/Stn. GIS Barhi NIT-1073 Dated 13.08.2019



Sep 16, 2019
Head Quarter Equipment .... 132 KV SF6 Circuit Breaker, Rupturing capacity-31.5 kA, Rated current-1000 Amps NIT-1071 Dated 13.08.2019



Sep 16, 2019
Field Office Civil Works .... Additional 100 MVA 220/132 kv T/F at 220 kv substation Dhurala. (site surfacing, dressing supply and spreading of crushed bajri (Civil Works) NIT-05-CWK-11-2019-20 Dated 14.08.2019



Sep 2, 2019 Sep 3, 2019
Field Office Department Work Revenue Creation of one no. 132KV line bay at 400KV S/Stn. Nuhiyawali to accommodate stringing of 2nd circuit of 132KV Nuhiyanwali – Dhudianwali D/C line, Approval Code:1B-2676*. NIT-04-XEN-TS-SRS-2019-20 Dated 29.07.2019



Aug 22, 2019
Field Office Civil Mtc. REC Outsourcing of General Maintenance of Residential and Non-Residential Buildings, Arboriculture/Horticulture including cleaning roads & paths, Security arrangement in colonies, offices and Rest Houses located at 132 KV HVPNL, Colony Bhiwani FY-2019-20 NIT-07-TS-BHW-2019-20 Dated 13.08.2019



Aug 20, 2019 Aug 21, 2019
Field Office Civil Works .... Providing 1no additional 132KV bay for 2CKT. Of 132KV S/C bhadson Indri line at 132kv S/Stn. Indri {Site surfacing, supply and spreading of crushed Bajri (Civil Works)} NIT-04-CWK-11-2019-20 Dated 09.08.2019



Aug 19, 2019 Aug 20, 2019
Head Quarter Equipment .... Procurement of various 132 kV Current Transformers and NCTs NIT-1065 Dated 08.07.2019



Aug 19, 2019
Field Office O&M .... Plugging the oil leakage/seepage of 100 MVA, 220/66 kV T/F T-3 BHEL make installed at 220 kV S/Stn. Rampur Kamboyan NIT-07-TSYNR-2019-20 Dated 08.08.2019



Aug 16, 2019 Aug 16, 2019
Head Quarter Equipment .... Procurement of various 400 kV Current Transformers NIT-1047 Dated 18.06.2019



Aug 21, 2019
Head Quarter Equipment .... PROCUREMENT OF 132KV ISOLATOR AND LINE & EARTH NIT-1044 Dated 11.06.2019



Aug 22, 2019
Field Office Service Works .... Supply of 01 No. Pickup Vans with Driver for SSE, 220 KV S/Stn., HVPNL, Bastara on contract basis under TS Divn. HVPNL, Karnal during the Financial Year 2019-20 or as per NIT-43-TS-KNL-2018-19 Dated 07.08.2019



Aug 19, 2019
Head Quarter Equipment .... 33KV Simplex Feeder C&R Panel 33KV Simplex I/C T/F C&R Panel NIT-1059 Dated 27.06.2019



Aug 20, 2019
Head Quarter Equipment .... 33KV Simplex Feeder C&R Panel 33KV Simplex I/C T/F C&R Panel NIT-1058 Dated 27.06.2019



Aug 20, 2019
Field Office Service Works .... Providing Sanitation Services, Arboriculture Services, office assistance & Security Services at 66 kv S/Stn. Mehra and Kazibans. (For the period 01.08.2019 to 31.03.2020). NIT-04-TSYNR-2019-20 Dated 02.08.2019



Aug 9, 2019
Field Office Civil Works NABARD Const. of Addl. ODSG, and allied Civil Works for creation 1 no. 33 KV O/G bay for Mohamadabad at 132 KV S/Stn Harsana Kalan NIT-03-CWS-2019-20 Dated 30.07.2019



Aug 9, 2019 Aug 14, 2019
Field Office Civil Works Capital Aug. of 66kv S/Stn. Sec-15, Jagadhari from 2x12.5/16 MVA 66/11kv to (2x12.5/16+ 1x10/12.5)MVA 66/11kv T/F-Construction of add. ODSG foundation, ODCT and allied equipments for T/F plinth T-3 with 02 no. anti fire wall at 66kv S/Stn. Sec-15, Jagadhari NIT-17-CCD-274 Dated 28.02.2019



Aug 9, 2019
Field Office Electrical Work .... creation of 2 No. 66KV line bays at 66 kv S/Stn.Ugala and yara NIT-09-66Kv Bay Uglala-Yara--2019-20 Dated 29.07.2019



Aug 14, 2019
Field Office Dept. SSTN .... Providing T-OFF arrangement of 2nd Circuit of 66KV D/C Palla - A4 line at 66KV Substation Bhupani (Labour Part Only) NIT-11-TS-FBD-2018-19 Dated 05.10.2018



Aug 14, 2019 Aug 14, 2019